BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Tempe, Arizona. Completed plans call civil work for a sidewalk / parking lot.

The project will design and construct the first 3.5 miles of a seven-mile on/off-street bike boulevard from ASU Research Park/Warner Road to the US-60 bike/ped bridge, generally along Country Club Way. The Country Club Way Bicycle and Pedestrian Improvement Project extends seven miles connecting ASU Research Park along Country Club Way to Tempe Town Lake and the regional Rio Salado path system. The project will link local and regional facilities, five schools, three existing canal paths, two bicycle/pedestrian bridges, four bicycle boulevards, travel across eight major arterials, connect to one light rail station at Smith-Martin and across the Union Pacific Railroad south of Apache Boulevard. It would include public art, enhanced sidewalks, shared use path, bike lanes, signalized street intersections & mid-block crossings, raised medians, a railroad crossing, and landscaping. The new facility will reduce vehicle-ped conflicts, introduce bike lanes and a path, landscaping, and art features while remaining ADA/MUTCD/AASHTO compliant. This project will include ADA Transition Plan identified repairs. The project will provide a sustainable and safe bicycle and pedestrian connection to major employment, educational facilities and shopping centers. This project is listed in the Transportation Master Plan and Tempe General Plan 2040 and implements the general plan goal of achieving the 20-Minute City. Construction of the project is funded with $2,611,733 federal grant and $288,867 Transit Tax. As of August 11, 2022, this project is currently in the City of Tempe FY 2022-2027 CIP. Information regarding a design firm and the general contractor selection timeline has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to early 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Post-Bid

Sidewalks / Parking Lot

$3,000,000.00

Public - City

Paving, Site Work

158

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
42
Bidding Soon
999
All Active Projects
440
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 17, 2023

June 16, 2023

img_map_placeholder

S Country Club Way, Tempe, AZ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.