EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 2, 2019 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Lake Villa, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Work to be performed under this Contract consists of the construction of the Rollins Savanna - Gurnee Trail Connection in accordance with the Contract Documents. The Work includes the construction of approximately 2400 lineal feet of 10-foot-wide aggregate trail which will link an existing trail loop at Rollins Savanna Forest Preserve to the intersection of US Route 45 and Dada Drive in Gurnee, Illinois. The trail work includes vegetation removal, pavement removal, topsoil, grading, drainage, trail construction and seeding. In addition, intersection improvements shall be performed in an Illinois Department of Transportation (IDOT) Right-of-Way, including traffic signal modifications, concrete walks and curbs and crosswalk markings. Any question and/or requests for clarifications must be submitted in writing to the Department of Purchasing no Later than 02/01/2019 10:00 AM, CST If any prospective Bidder is in doubt as to the true meaning of any part of the Bid Package, such prospective Bidder shall submit to Owner an email directed to Owners Purchasing Department, purchasingdept@LCFPD.org, for an interpretation thereof not later than the date and time Bid Security, Bonds, and Insurance A. Bid Security. Each Bidders Proposal shall be accompanied by a security deposit of at least 10 of the Bidder's Price Proposal in the form of (1) a cashier's check or certified check drawn on a solvent bank insured by the Federal Deposit Insurance Corporation and payable without condition to Owner; or (2) a Bid Bond in the form included in the Bid Package, or a form otherwise approved by Owner, from a surety company licensed to do business in the State of Illinois with a general rating of A and a financial size category of Class III or better in Best's Insurance Guide. If the required bid security/bond is not submitted with your bid proposal, your bid proposal will be rejected. B. Performance and Payment Bonds. The successful Bidder will be required to furnish a Performance Bond and a Labor and Material Payment Bond upon award of the Contract, each in the penal sum of the full amount of the Contract Price, on forms provided in the Bid Package from such a surety company meeting the requirements set forth above. Each Bidder's Proposal shall be accompanied by a letter from such a surety company stating that it will execute Bonds on forms provided in the Bid Package upon award of the Contract to Bidder. If the required letter from your surety company is not submitted with your bid proposal, your bid proposal will be rejected. C Insurance. The successful Bidder will be required to furnish certificates and policies of insurance as required by Section 4.2 of the Contract upon award of the Contract. Each Bidders Proposal shall be accompanied by a letter from Bidder's insurance carrier or its agent certifying that said insurer has read the requirements set forth in the Contract and will issue the required certificates and policies of insurance upon award of the Contract to Bidder. If the required letter from your insurance carrier/agent is not submitted with your bid proposal, your bid proposal will be rejected.

Award

Roads / Highways

$383,791.00

Public - County

Paving, Site Work

39

1

2

10

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Quality Assurance, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Architectural Cast-in Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Metal Joists, Metal Decking, Steel Decking, Cold-Formed Metal Framing
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Storage Specialties, Postal Specialties, Mail Boxes
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Pruning, Watering, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Concrete Curbs and Gutters, Paving Specialties, Pavement Markings, Painted Pavement Markings, Planting, Plants, Shrubs
Division 33 - Utilities

Division 33 - Utilities

Utilities, Storm Drainage Utilities
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
256
Active Projects
168
Bidding Soon
2,446
All Active Projects
1,204
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2019

March 13, 2019

img_map_placeholder

Multiple Locations, Lake Villa, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Trail Connection - Gurnee, Rollins

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.