Site work and paving for a civil project in Sioux City, Iowa. Design plans call for paving for a road / highway; and for site work for a water / sewer project.

Due to the recent identification of special flood hazard zones in the Hoeven Valley, the need to identify mitigation alternatives for the individual areas is necessary. An evaluation of the area was completed and options are under consideration. This CIP will set up a fund for future design and engineering work and will help to establish funding for the completion of the mitigation projects. A portion of the work plan was identified out of the Floyd River Flood Reduction Study completed by HR Green in August 2013. This identified project work to include berm modifications & additional culverts which will reduce the extent of the flood zone and accommodate a recreational trail. Additionally, in July 2015 HR Green completed the Leeds Area Interior Drainage Study which built upon the data collected in the 2013 study and identified in greater detail the existing conveyance network and ponding scenarios associated with a number of storm events. In 2018 HR Green started working towards 30% plans in order to submit a Conditional Letter of Map Revision (CLOMR) application to FEMA. Pending FEMA's acceptance of the modeling results, complete storm infrastructure upgrades estimated at a cost of $2.6 million to prevent flooding resulting from a 100 year rain event for properties in the Leeds area. These improvements include an excavated channel, approximately 500' of new 48" pipe, approximately 525' of new 60" pipe, and approximately 125' of upgraded pipe from 36" to 48". This option would still allow some ponding in the street right-of-way but remove the vast majority of the 133 properties from Zone AH. No properties would be affected by flooding of one foot or greater; however, 7 of the 133 properties would be impacted by flood depths smaller than one foot. The flooding would be limited to water slightly crossing the property line of 5 residential and 2 businesses along Floyd Boulevard and Fillmore Street. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of February 1, 2022, a design engineer has been selected. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Roads / Highways

$4,390,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
59
Bidding Soon
545
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2024

Project location map

Outer Dr N, Sioux City, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.