BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Louisburg, North Carolina. Conceptual plans call for the renovation of a transportation facility.

https://www.bizjournals.com/triangle/news/2023/07/14/franklin-county-airport-runway-extension-project.html Jul 13, 2023 Franklin County's main airport is embarking on its latest improvement: a $26 million project to extend its existing runway and realign its road to add more hangars for planes. The Triangle North Executive Airport, located at 440 Airport Road in Louisburg, will lengthen its runway by about 600 feet - giving it over 6,000 feet, according to Bo Carson, director of the airport. Per Carson, the runway extension will help further development, as the airport hopes to attract more large corporate jets traveling to Franklin County for business or leisure. The road realignment will allow for more hangars for single-engine aircraft as well as medium hangars that can fit larger airplanes with turbojet engines. Franklin County is riding a wave of growth. Between 2021 and 2022, it was the fastest-growing county in the Greater Triangle in terms of population and the fourth-fastest overall in North Carolina. The county's population grew by by 3.8 percent to nearly 75,000, according to data from the U.S. Census Bureau. Carson said the Triangle North Executive Airport, which is adjacent to the 252-acre, Triangle North Franklin industrial park, serves as a "gateway to Franklin County." "It opens us up to the world," Carson said. The infrastructure projects, which are funded through the state, "will bring about more economic development because it will bring more activities and operations to the airport that can then go to the rest of the county." The airport generates more than $28 million in annual economic output and has created 220 direct and indirect jobs, according to the North Carolina Department of Transportation's "State of Aviation" report from January. Currently, CaptiveAire Systems, a leading manufacturer of commercial kitchen vent hoods, houses an aircraft at an airport hangar and flies it out to construction sites across the country, Carson said. This is the latest improvement project the airport has undertaken. In 2021, the airport received a roughly $12 million grant to do a full airfield pavement rehabilitation and an apron expansion to give more area for planes to park or refuel. The airport isn't the only place in Franklin County receiving infrastructure grants from the state. According to Franklin County spokesman James Hicks, a $55 million project will "widen the existing two-lane road to four lanes and connect the four lanes at Fox Park Road in Louisburg to the newly constructed four lanes at Flat Rock Church Road and Clifton Pond Road in the Royal community" and create more access to the airport. ______________________________________________________________________________________________________________________ The scope of work includes runway extension As of October 2, 2019, this project is in the planning stages pending further approvals. A airport master plan is in progress. Although a firm timeline for construction has not been determined, construction is not expected to begin before May 2022.

Conceptual

Water / Sewer

$12,100,000.00

Public - Federal

Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
75
Bidding Soon
1,524
All Active Projects
612
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 12, 2024

img_map_placeholder

440 Airport Rd, Louisburg, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.