BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a civil project in Des Moines, Iowa. Design plans call for outdoor lighting for a road / highway; and for site work for a water / sewer project.

Improvements are planned along Vandalia Road between the new SE Connector and Highway 65 to address safety concerns. These improvements address issues with signage, lighting, and drainage. Signage improvements have been be addressed over the past year. The segment from the SE Connector past the WRA entrance was reconstructed with new lighting as part of a WRA sewer project. Drainage improvements include storm sewer in ditching along Vandalia Road Lighting improvements along the corridor will be coordinated with the proposed drainage improvements. Project is included City of Des Moines FY 2021-2026 CIP Page 235 _______________________________________________________________________________________________________________________ Improvements are planned along Vandalia Road between the new SE Connector and Highway 65 to address safety concerns. These improvements address issues with signage, lighting, and drainage. Signage improvements have been be addressed over the past year. The segment from the SE Connector past the WRA entrance was reconstructed with new lighting as part of a WRA sewer project. Drainage improvements include storm sewer in ditching along Vandalia Road Lighting improvements along the corridor will be coordinated with the proposed drainage improvements. Project is included City of Des Moines FY 2021-2026 CIP Page 235 _______________________________________________________________________________________________________________________ Improvements are planned along Vandalia Road between the new SE Connector and Highway 65 to address safety concerns. These improvements address issues with signage, lighting, and drainage. Signage improvements will be addressed over the next year. The segment from the SE Connector past the WRA entrance will be reconstructed with new lighting as part of a WRA sewer project. Drainage improvements include storm sewer in ditching along Vandalia Road and will be constructed over the next few years. Lighting improvements along the corridor will be coordinated with the proposed drainage improvements. As of September 13, 2018, this project is included in the Fiscal Year 2018-2023 CIP. Design work is currently underway. Information regarding the design team and contractor selection has not been disclosed. A firm timeline has not been established; however, construction is planned to begin in the first quarter of 2018 and be complete by mid-2021.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 22, 2023, no new information available

Design

Roads / Highways

$350,000.00

Public - City

Outdoor Lighting, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
36
Bidding Soon
549
All Active Projects
226
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 27, 2023

img_map_placeholder

Vandalia Rd, Des Moines, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.