BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Concord, North Carolina. Conceptual plans call for paving for a sidewalk / parking lot; and for site work for a road / highway.

The design for the Coddle Creek Greenway will be completed by Engineering, and then the development will be done in three phases. Phase I: Includes greenway within Dorton Park along Coddle Creek, connectivity downstream to Poplar Crossing, and a bridge connection to multi-use path along the south side of Poplar Tent Road (Poplar Tent Road widening), approximately .75 miles at $1.5 million per mile plus bridge costs. Then extends the trail to Weddington Road and provides a multi-use path along Weddington Road to George Liles Pkwy, work is approximately 1.65 miles at $3.1 million per mile as identified in the Open Space Connectivity Analysis (OSCA). Phase II: Extends the trail from Weddington Road to Concord Parkway/Concord Farms Road along Coddle Creek. Total of 1.75 miles at $3.1 million per mile. Phase III: Extends the trail from Dorton Park to Kannapolis (Afton Ridge) along Coddle Creek. Total of .60 miles at $3.1 million per mile. As of July 16, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$13,525,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
58
Bidding Soon
1,097
All Active Projects
463
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

img_map_placeholder

Multiple Locations, Concord, NC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.