Site work and paving for a road / highway in Dover, New Hampshire. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Work Included: Contractor shall contact Dig-Safe, local public works and water and sewer authorities, and other utilities who are not members of Dig-Safe prior to performing any underground work. Meet all requirements, regulations, and laws concerning layout, notification, excavation, demolition, and explosive work. Meet the requirements ofRSA 374:55. Work Specified Elsewhere. This Section is not a stand-alone Section. Other requirements which relate to this Section are noted elsewhere in these documents. The Contractor and all Subcontractors are required to review this entire document along with the Drawings in an effort to identify all requirements. The Owner will be responsible for the operation of all existing facilities and any new facilities accepted during the construction period. The Contractor shall notify the Engineer in writing when, in his opinion, a portion of the construction is ready to be accepted by the Owner. After inspection of the work the Engineer will either recommend that the Owner accept the portion of construction or shall identify remedial work needed to be performed by the Contractor. These responsibilities of the Owner shall include the cost of all labor and utilities after acceptance. Prior to acceptance by the Owner, all costs shall be the responsibility ofthe Contractor. All damage to existing or accepted equipment or structures, as a result of the Contractor's or his Subcontractor's operations shall be replaced or repaired by the Contractor at no additional cost to the Owner. All damage to existing structures, as a result of digging test pits, shall be repaired by the Contractor by the Contractor at no additional cost to the Owner. All materials shall be the responsibility ofthe Contractor. The Contractor shall submit Traffic Control Plans for review and approval in advance ofContractor operations. The Contractor will be responsible for State, Federal and local permits where applicable. Coordinate activities involving other utilities with the respective utility owners. Substantial Completion: 240 Days Final Payment: 270 Days

Award

Roads / Highways

$4,723,660.00

Public - City

Paving, Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
104
Bidding Soon
1,965
All Active Projects
805
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2019

September 26, 2019

img_map_placeholder

Spur Rd, Dover, NH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.