BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 2, 2025 at 8:00 PM

Updated October 3, 2025

Site work and paving for a sidewalk / parking lot in Gilbert, Arizona. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The existing non-functioning water feature at the northwest corner of the library will be removed, and the parking lots on the north and west sides of the building will be connected, allowing vehicles to circulate without exiting the site and providing additional parking spaces. Dedicated right turn lanes into the site will be added on Greenfield Road and Guadalupe Road. The existing parking lots will be resurfaced, and drainage issues on the site will be addressed. As of October 2, 2025, this project is included in the Town of Gilbert's FY 2026-2035 Capital Improvement Program (CIP). Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Sidewalks / Parking Lot

$10,109,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
35
Bidding Soon
1,099
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2031

Project location map

775 N Greenfield Rd, Gilbert, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.