Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Hines, Oregon. Completed plans call for site work for a road / highway; and for paving for a road / highway.
($10,000,000 - $20,000,000). Req. approx. 2,140 hr training; 1,345 ft2 temp. signs; 7,900 hr flaggers; 3,250 hr pilot car; 2 ea. AFAD; const. surv. work; 354 yd3 emb. in pl.; 139 ft culv. pipe; 1,258 ft duct. iron pipe; 50 ea. sloped end sec.; 277 yd2 trench resurf.; 427,200 yd2 cold pln. pvmt. rem.; 15, 575 ton agg shldr & base; 443,000 yd2 iCTB; 7,300 ton portland cement in iCTB; 810 ton emuls. asph.; 100,800 ton lvl 2 ACP (6,410 ton PG 58-34 asph. cem.); 990 ea. delin.; 25.9 mi rumble strips; 366,100 ft striping; 166.1 ft2 signs Bid Opening will be in the lobby of the Oregon Department of Transportation, 3930 Fairview Industrial Drive SE, Salem, Oregon, The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. ORDOT - US 395: Big Stick Creek - Alkali Lake Section of the Lakeview
Award
Roads / Highways
$10,881,875.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 23, 2020
August 24, 2020
US-395, Hines, OR
Related To This Project
Hines, OR
Bid Date: Jun 08 2023
Hines, OR
Bid Date: May 18 2023
Hines, OR
--
Hines, OR
Bid Date: Aug 30 2023
Hines, OR
Bid Date: Aug 31 2023
Hines, OR
Bid Date: Oct 31 2023
Hines, OR
Bid Date: Apr 18 2024
Hines, OR
Bid Date: May 10 2024
Hines, OR
Bid Date: Sep 27 2022
Hines, OR
Bid Date: Sep 09 2022
Hines, OR
--
Hines, OR
Bid Date: Sep 09 2022
Hines, OR
Bid Date: Sep 09 2022
Hines, OR
Bid Date: Jul 05 2022
Hines, OR
Bid Date: Sep 27 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.