EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 4, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Meridian, Idaho. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Project No. 519034.001, 10976 Intersection improvement project which includes constructing a multi-lane roundabout. Project includes a multi-use path and removing and replacing the existing bridge over Ten Mile Creek, construct water and sewer mains and services, and fiber optic conduit/boxes. Corridor improvement project which includes widening to five (5) lanes and constructing a multi-use path on both sides of Locust Grove. Project includes enhanced crossing (PHB) across Locust Grove Road at Time Zone Drive and the removal and replacement of a bridge over the Nine Mile Creek Lateral. Also includes abandoning existing and constructing new water and sewer mains and services, fiber optic conduit/boxes. All questions or clarifications concerning the content and requirements of the Invitation to Bid (ITB) must be posted in the Q&A section of the solicitation located at the eProcurement Portal. All questions or clarifications must be submitted by 12:00 pm on Monday, October 31, 2022. Any interpretation that may alter or change the ITB will be in writing, in the form of Addenda, which will be furnished via the eProcurement Portal. It is the Bidder's responsibility to check for Addenda before submitting bids. Proposals must be accompanied by an original or photocopy or electronic version, e.g. PDF, FAX, etc. of certified check, cashier's check, or a bid bond (collectively referred to hereafter as "Bid Security") issued by a surety authorized to issue such bonds in the State of Idaho, in an amount of ten percent (10%) of the total amount of the proposal submitted. If a photocopy or electronic version of a certified check, or cashier's check is provided with the proposal, an original certified check or cashier's check shall be submitted to ACHD within 48 hours of the bid opening. In addition, any Contractor submitting a Certified Check or Cashier's Check for Bid Security will be required to submit within 48 hours of the bid opening, a letter from their bonding company stating that it will guarantee bonding for the Bidder, in the event said Bidder is notified via a "Notice of Intent to Award Letter," that it is the apparent low-cost Bidder and may be awarded the contract. Said letter is to be included with the Proposal Form, and shall name the Bidder, project number, and the amount of bonding value being guaranteed . The ACHD reserves the right to reject all bids, including the apparent low bid, when these bids are in excess of ten percent (10%) over the Engineer's Estimate. The apparent low cost responsive Bidder who has received the "Notice of Intent to Award Letter," and who fails to execute the contract and furnish the executed contract, Contract Certification, required performance bond, payment bond and insurance declarations, by the date and time specified by ACHD in the "Notice of Intent to Award Letter," may forfeit the Bid Security that accompanied the bid submitted; the Bid Security may be retained, as liquidated damages, by ACHD and it is agreed that this sum is a fair estimate of the amount of damages ACHD will sustain in case the Bidder fails to enter into a contract and furnish the performance bond, payment bond, and insurance certificates as hereinbefore provided. Bid Security deposited in the form of a certified check, or cashier's check shall be subject to the same requirements as a bid bond. This item consists offurnishing and installing bike railing at locations shown on the drawings, or as directed. Bike railing shall be installed in accordance with the details specified in the currently adopted ACHD supplement to the ISPWC - SD 2040-L. Proj. 519034.001

Award

Roads / Highways

$11,176,845.00

Public - County

Paving, Site Work

43

21

16

5

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
23
Bidding Soon
236
All Active Projects
111
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Locust Grove, Victory to Overland Roadway and Roundabout

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.