Site work for a mixed-use development in Madison, Wisconsin. Completed plans call for site work for a water / sewer project; and educational facility.
This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first.Within 245 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest,qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protectiondivisions of work, DFD will bid onebid package for all work to general prime contractors. Project work includes replacement of the existing underground, manual isolation valves in the 30 39 inch chilled water supply and return mains located at the southeast corner of the intersection of North Charter Street and West Johnson Street with new valves. The existing underground, manual isolation valves in the 24 inch chilled water supply and return mains located at the northeast corner of the intersection of North Charter Street and University Avenue will be replaced with new valves. The construction of this project will involve two phases. The first phase is an investigative phase and will include excavation of the chilled water supply and return pipes at each location of the valve replacements and new valve installations. These investigative excavations are required to obtain specific information regarding the existing installations that is required to allow determination of the pipe lengths, joint types, closure pieces, etc. required to install new valves in the respective pipe segments. This is required as there is no as-built information available for the existing installations that provides the critical information that is required to design the exact pieces of pipe with appropriate end connections to provide a complete pipe installation associated with the valve replacements and installations. This existing pipe / pipe joint information is required, before the pipe manufacturer can manufacture the required pipe lengths, with appropriate joint types and closure pieces, as the new pieces will have to exactly match the construction of the existing piping A-2 installation.Per the pipe manufacturer, it will take 8 -12 weeks for the required pipe to be manufactured, after the existing pipe / pipe joint information is received. Based on this lead time, the investigative excavations will be temporarily back filled, and the sites restored to accommodate 3 normal vehicular and pedestrian traffic.The second phase which includes the replacement of existing underground valves will occur when the new pipe is available. As part of the second phase the sites will be re-excavated to allow replacement 6/ installation of the new valves and associated piping. Upon completion of the replacement / installation of the underground chilled water manual isolation valves, all areas disturbed by the project will be fully restored including roadways, curbs, gutters, terrace areas, trees, sidewalks, landscaping features, and site structures. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted NOTICE: Effective January 1, 2014, all potential bidders must be certified by DOApriorto submitting 16bids on state construction projects over $50,000.
Bid Results
Water / Sewer
$1,289,500.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 27, 2021
July 27, 2021
Multiple Locations, Madison, WI
Related To This Project
Madison, WI
Bid Date: Jul 11 2019
Madison, WI
--
Madison, WI
--
Madison, WI
Bid Date: Nov 30 2022
Madison, WI
Bid Date: Nov 30 2022
Madison, WI
Bid Date: Jul 13 2023
Madison, WI
Bid Date: Dec 17 2020
Madison, WI
Bid Date: Sep 23 2021
Madison, WI
Bid Date: Jan 21 2021
Madison, WI
Bid Date: Mar 30 2021
Madison, WI
Bid Date: Apr 07 2021
Madison, WI
Bid Date: Jun 22 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.