BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 2, 2024 at 8:00 PM

Updated October 4, 2024

Site work for a water / sewer project in Fort Lupton, Colorado. Design plans call for site work for a water / sewer project.

As of October 2, 2024, this project is in design. Construction should begin in 2025. The Fort Lupton Potable Water Distribution pump house is located at 275 College Avenue, approximately1200 feet north of State Highway 52, Fort Lupton, Colorado 80621. The City intends to construct a new elevated water tank and connect it to the existing water distribution system. Buyers Requirements General Requirements - Insurance Required - License Required Question Acceptance Deadline 01/27/2023 02:00 AM EST Questions are submitted online No The method of contractor selection has not been determined at this time.

Design

Water / Sewer

$2,500,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
103
Bidding Soon
1,304
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

Project location map

275 College Ave, Fort Lupton, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.