Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Normal, Illinois. Completed plans call for the renovation of a educational facility.
Replace Watterson Tower Penthouse Air Handling Units and associated piping, ductwork, electrical, plumbing and controls, on the campus of Illinois State University. The project will consist of multiple prime bids divided as follows: 1. General Contractor shall be responsible for: acting as coordinating contractor, general conditions, shaft repairs, fire-stopping, painting, miscellaneous metalwork including roof ladder, roofing work. 2. Heating / Plumbing / Fire Protection Contractor shall be responsible for demolition and new work for the following: hydronic piping, pneumatic controls tubing (demolition), meters and gauges, piping hangers and supports, valves, hydronic coils, hydronic equipment, pumps and accessories, refrigeration piping, air-to-air heat recovery coils, piping and supplied equipment insulation, vibration control for supplied materials, piping and supplied equipment identification, hydronic system test and balance, storm drain piping, fire protection piping, lifts and cranes for their work, start up for supplied equipment, install hydronic control valves, differential pressure sensors, and thermowells furnished by temperature controls contractor. 3. Ventilation Contractor shall be responsible for demolition and new work for the following: energy recovery ventilators and support structure, ductwork, ductwork hangers and supports, fans, vibration control for supplied materials, identification for supplied ductwork and equipment, air test and balance, fire dampers and air duct accessories, access doors, grilles/registers, louvers, roof hoods, ductwork and supplied equipment insulation, duct cleaning, lifts and cranes for their work, start up for supplied equipment, install control dampers furnished by temperature controls contractor, install duct detectors furnished by electrical contractor. 4. Electrical Contractor shall be responsible for demolition and new work for the following: electrical wiring, electrical panels, electrical identification, variable frequency drives, lighting, fire detection devices, fire alarm wiring and testing. 5. Temperature Controls Contractor shall be responsible for demolition and new work for the following: wiring and conduit for DDC controls, control dampers, hydronic control valves, control system startup, owner training. Clarifications or modifications to drawings or specifications will be posted via addendum. To give questions appropriate consideration and to give bidders time to respond to the resulting clarifications, the University requires that all questions be submitted no later than 4:30pm February 13, 2020 to Jackie Gunderson at jnmaste@ilstu.edu. The question deadline has been extended to Wednesday, February 26, 2020 at 4:30pm. Awarded to: Contractor: Givsco Construction, Pekin, IL Amount: An estimated $256,300 Division of Work: General (unsuccessful, responsive bidders: 0) Terms: An estimated start date of 5/18/2020 through 8/2/2021 Renewals: None Contractor: Siemens Industry, Inc., Bloomington, IL Amount: An estimated $586,610 Division of Work: Controls (unsuccessful, responsive bidders: 0) Terms: An estimated start date of 5/18/2020 through 8/2/2021 Renewals: None Contractor: Pipco Companies, Ltd., Peoria, IL Amount: An estimated $1,614,000 Division of Work: Heating (unsuccessful, responsive bidders: 0) Terms: An estimated start date of 5/18/2020 through 8/2/2021 Renewals: None Contractor: W.M. Masters, Inc., Bloomington, IL Amount: An estimated $984,000 Division of Work: Ventilation (unsuccessful, responsive bidders: 2) Terms: An estimated start date of 5/18/2020 through 8/2/2021 Renewals: None Contractor: W.M. Masters, Inc., Bloomington, IL Amount: An estimated $234,370 Division of Work: Electrical (unsuccessful, responsive bidders: 1) Terms: An estimated start date of 5/18/2020 through 8/2/2021 Renewals: None
Award
Educational
$29,512.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2020
May 11, 2020
100 N University St, Normal, IL
Related To This Project
Normal, IL
Bid Date: May 31 2022
Normal, IL
Bid Date: May 20 2022
Normal, IL
Bid Date: Jul 28 2020
Normal, IL
Bid Date: May 26 2022
Normal, IL
Bid Date: May 26 2022
Normal, IL
Bid Date: Jun 24 2022
Normal, IL
Bid Date: Feb 23 2023
Normal, IL
Bid Date: Jun 02 2022
Normal, IL
--
Normal, IL
Bid Date: Jun 02 2021
Normal, IL
Bid Date: Jan 24 2023
Normal, IL
Bid Date: Jan 17 2023
Normal, IL
--
Normal, IL
Bid Date: Jun 07 2022
Normal, IL
Bid Date: May 26 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.