Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 27, 2025 at 7:00 PM
Updated February 28, 2025
Site work and paving for a mixed-use development in Longmont, Colorado. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Update:https://longmontcolorado.gov/wp-content/uploads/2025/02/2025-29-Adopted-CIP-v5.pdf In accordance with the policies of the Multi-Modal Transportation Plan, this long term program will design and construct various gaps or deteriorated trails in the City's primary and secondary greenway trail system. This project also includes sidewalk, trail and related improvements that improve access to the City's greenway trail system. Some sections are partially complete, while others have no improvements. Work on any one section may include installation or widening of the bikeway, reconstructing pavement sections, landscaping, irrigation systems, rehabilitation of the pavement surface, addition of secondary greenway paths and other related improvements. Examples of trail sections that need to be completed are: Sections of the Oligarchy Ditch Greenway and Spring Gulch Greenway; a trail between Village at the Peaks and S. Sunset St; a trail connecting Mill Village to the St Vrain Greenway; trails adjacent to the Mill Ditch and Rough and Ready Ditch Greenway, the Trend Homes Subddivision frontage and internal trail, several trail connections near schools, other primary and secondary greenways, and several parks that have deteriorated or missing sections of bike path that would improve connection to a trail outside of the park. 2024 work includes completion of the Dry Creek trail from Sam's to Sunset and design of the repairs to the Rough & ready trail between Pace St and Mountain View Ave and repairs to the Trend Homes subdivision trails. 2025 funds are for construction of those two repair projects. Project is included in City of Longmont Fiscal Year 2025-2029 Page no 113 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- In accordance with the policies of the Multi-Modal Transportation Plan, this long term program will design and construct various gaps or deteriorated trails in the City's primary and secondary greenway trail system. This project also includes sidewalk, trail and related improvements that improve access to the City's greenway trail system. Some sections are partially complete, while others have no improvements. Work on any one section may include installation or widening of the bikeway, reconstructing pavement sections, landscaping, irrigation systems, rehabilitation of the pavement surface, addition of secondary greenway paths and other related improvements. Examples of trail sections that need to be completed are: Sections of the Oligarchy Ditch Greenway and Spring Gulch Greenway; a trail between Village at the Peaks and S. Sunset St; a trail connecting Mill Village to the St Vrain Greenway; trails adjacent to the Mill Ditch and Rough and Ready Ditch Greenway, the Trend Homes Subddivision frontage and internal trail, several trail connections near schools, other primary and secondary greenways, and several parks that have deteriorated or missing sections of bike path that would improve connection to a trail outside of the park. 2024 work includes completion of the Dry Creek trail from Sam's to Sunset and design of the repairs to the Rough & ready trail between Pace St and Mountain View Ave and repairs to the Trend Homes subdivision trails. 2025 funds are for construction of those two repair projects. As of December 3, 2024, this project is included in the City of Longmont's Fiscal Year 2024-2028 CIP. Further infromation regarding a design firm and timeline for construction not yet available. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$1,195,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2025
Multiple Locations, Longmont, CO
Related To This Project
Longmont, CO
--
Longmont, CO
Bid Date: Mar 25 2022
Longmont, CO
--
Longmont, CO
Bid Date: Mar 29 2022
Longmont, CO
--
Longmont, CO
Bid Date: Apr 26 2021
Longmont, CO
--
Longmont, CO
Bid Date: Feb 18 2022
Longmont, CO
Bid Date: Mar 09 2022
Longmont, CO
--
Longmont, CO
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
