BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Longmont, Colorado. Conceptual plans call for site work for a water / sewer project.

UPDATE:https://longmontcolorado.gov/wp-content/uploads/2024/07/2024-28-Adopted-CIP-v7.pdf Project is in City of Longmont capital budget fy 2024 - 2028 CIP page 42 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The Wastewater Collection System assets (manholes, pipes, and pump stations) are monitored/inspected via Closed Circuit TV inspection and other pipe condition assessment techniques. Operations and Engineering Services review inspection data to identify and prioritize asset rehabilitation or replacement. The City rehabilitates over 7,000 feet per year of Wastewater Collection System pipes using open cut trenching and trenchless methods that include cured-in-place pipe (CIPP) and pipe bursting. The annual budget is use to maintain critical assets using these rehabilitation techniques. Open-cut pipe replacement and other special projects (e.g. manhole coating) have been identified and are included as additional cost in upcoming years: 2022: Atwood St. sewer installation near BNSF railroad (block 1); open-cut pipe repair (600-ft) on Francis St. from 3rd to 6th; rehabilitation of four (4) manholes with protective coating 2023: Atwood St. sewer installation near BNSF railroad (block 2) 2024: Atwood St. sewer installation near BNSF railroad (block 3) 2025: Atwood St. sewer installation near BNSF railroad (block 4) This project is included in the city's 2022-2026 Capital Improvement Plan (CIP) and funding is allocated for 2022, 2023, 2024, 2025, 2026. As of March 13, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$10,362,520.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
47
Bidding Soon
933
All Active Projects
367
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.