Renovation of a water / sewer project in Brighton, Tennessee. Completed plans call for the renovation of a water / sewer project.
The State is seeking to hire a CM/GC who can effectively partner with the State on the construction of the Memphis Regional Megasite. The Infrastructure is in various of stages of construction, procurement, and design. The remaining components will be developed with input from the CM/GC. The State intends to secure a contract for CM/GC services. The CM/GC shall provide consulting, scheduling, and estimating/cost control services during the various design phases of the Project, and shall be the general contractor during construction, holding the trade contracts and providing the management and construction services during the construction phase. The CM/GC shall competitively procure and contract with the trade contractors and assume the responsibility and the risk of construction delivery within the specified cost and schedule terms, after providing a Guaranteed Maximum Price (GMP) for the scope(s) of work for the project identified on the RFP cover page of the Project Specific Documents. The State is seeking to hire a CM/GC who can effectively partner with the State on the construction of the Memphis Regional Megasite. The Infrastructure is in various of stages of construction, procurement, and design. The remaining components will be developed with input from the CM/GC. The State intends to secure a contract for CM/GC services. The CM/GC shall provide consulting, scheduling, and estimating/cost control services during the various design phases of the Project, and shall be the general contractor during construction, holding the trade contracts and providing the management and construction services during the construction phase. The CM/GC shall competitively procure and contract with the trade contractors and assume the responsibility and the risk of construction delivery within the specified cost and schedule terms, after providing a Guaranteed Maximum Price (GMP) for the scope(s) of work for the project identified on the RFP cover page of the Project Specific Documents. The major components of the infrastructure project consist of the following: o Wastewater Treatment Plant (WWTP) o Effluent Lagoon o Water Treatment Plant and Wells o Site Water Main connecting the North and south Water Towers o North Water Tower There are additional major components of the infrastructure that are performed under a separate contract. The construction of these components will not be under the purview of the CM/GC. However, coordination efforts with other entities may be required. These major components are listed below: o Approximately 36.5 miles of force main beginning at the Northwest Corner of the Megasite in Haywood County ending with the outfall at Mississippi River in Tipton County at the USACE casting field. (Performed under a separate contract). o Intermediate Pump Station that will handle treated effluent at a rate of 4.6 MGD per day approximately 15 miles from the proposed WWTP located in the Northwest Corner of the Megasite. (Performed under a separate contract). o South Water Tower (Performed under a separate contract) . The remaining components of the Infrastructure in which the CM services are being solicited are described below: o Construction of a WWTP- Construction of a new green field plant to utilize SBR technology. The plant will be designed assuming pretreatment standards for industries prior to conveying wastewater to the plant. The proposed plant will be designed to treat a total of approximately 4.6 MGD of wastewater. The facility will be designed assuming continuous operation. The wastewater treatment plant facility will also include a pump station which will connect to the force main (separate contract) leaving the site going to a pump station (separate contract) near Covington. Coordination with other entities may be required around force main and pump station elements. o Lagoon (for Effluent storage) - The lagoon will be designed to hold 14 days of effluent. As the WWTP will be designed to run continuous, the lagoon(s) will be designed as overflow for effluent or when maintenance of the effluent force main is required. Lagoon(s) will be designed with mowable slopes due to predicted utilization of them requires they will remain dry the majority of the time. The Project shall be located in Fayette, Haywood, and Tipton Counties, Tennessee. Meeting Link: https://tn.webex.com/tn/j.phpMTID=m418f4189915ba7160eaa032a45995971 Call-In Number: (415) 655-0001 Meeting Number (access code): 2301 702 5450 Meeting Password: STREAM (787326, if using a phone)
Award
Water / Sewer
$87,000,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 10, 2021
March 15, 2022
To Be Determined, Brighton, TN
Related To This Project
Brighton, TN
Bid Date: Oct 25 2024
Brighton, TN
Bid Date: Dec 06 2024
Brighton, TN
Bid Date: May 01 2023
Brighton, TN
Bid Date: May 01 2023
Brighton, TN
Bid Date: May 01 2023
Brighton, TN
Bid Date: May 01 2023
Brighton, TN
Bid Date: May 01 2023
Brighton, TN
Bid Date: May 01 2023
Brighton, TN
Bid Date: Jul 27 2023
Brighton, TN
Bid Date: May 06 2019
Brighton, TN
Bid Date: Dec 03 2018
Brighton, TN
--
Brighton, TN
Bid Date: Feb 10 2023
Brighton, TN
Bid Date: Sep 15 2022
Brighton, TN
Bid Date: Apr 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.