BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Brighton, Tennessee. Completed plans call for the renovation of a water / sewer project.

The State is seeking to hire a CM/GC who can effectively partner with the State on the construction of the Memphis Regional Megasite. The Infrastructure is in various of stages of construction, procurement, and design. The remaining components will be developed with input from the CM/GC. The State intends to secure a contract for CM/GC services. The CM/GC shall provide consulting, scheduling, and estimating/cost control services during the various design phases of the Project, and shall be the general contractor during construction, holding the trade contracts and providing the management and construction services during the construction phase. The CM/GC shall competitively procure and contract with the trade contractors and assume the responsibility and the risk of construction delivery within the specified cost and schedule terms, after providing a Guaranteed Maximum Price (GMP) for the scope(s) of work for the project identified on the RFP cover page of the Project Specific Documents. The State is seeking to hire a CM/GC who can effectively partner with the State on the construction of the Memphis Regional Megasite. The Infrastructure is in various of stages of construction, procurement, and design. The remaining components will be developed with input from the CM/GC. The State intends to secure a contract for CM/GC services. The CM/GC shall provide consulting, scheduling, and estimating/cost control services during the various design phases of the Project, and shall be the general contractor during construction, holding the trade contracts and providing the management and construction services during the construction phase. The CM/GC shall competitively procure and contract with the trade contractors and assume the responsibility and the risk of construction delivery within the specified cost and schedule terms, after providing a Guaranteed Maximum Price (GMP) for the scope(s) of work for the project identified on the RFP cover page of the Project Specific Documents. The major components of the infrastructure project consist of the following: o Wastewater Treatment Plant (WWTP) o Effluent Lagoon o Water Treatment Plant and Wells o Site Water Main connecting the North and south Water Towers o North Water Tower There are additional major components of the infrastructure that are performed under a separate contract. The construction of these components will not be under the purview of the CM/GC. However, coordination efforts with other entities may be required. These major components are listed below: o Approximately 36.5 miles of force main beginning at the Northwest Corner of the Megasite in Haywood County ending with the outfall at Mississippi River in Tipton County at the USACE casting field. (Performed under a separate contract). o Intermediate Pump Station that will handle treated effluent at a rate of 4.6 MGD per day approximately 15 miles from the proposed WWTP located in the Northwest Corner of the Megasite. (Performed under a separate contract). o South Water Tower (Performed under a separate contract) . The remaining components of the Infrastructure in which the CM services are being solicited are described below: o Construction of a WWTP- Construction of a new green field plant to utilize SBR technology. The plant will be designed assuming pretreatment standards for industries prior to conveying wastewater to the plant. The proposed plant will be designed to treat a total of approximately 4.6 MGD of wastewater. The facility will be designed assuming continuous operation. The wastewater treatment plant facility will also include a pump station which will connect to the force main (separate contract) leaving the site going to a pump station (separate contract) near Covington. Coordination with other entities may be required around force main and pump station elements. o Lagoon (for Effluent storage) - The lagoon will be designed to hold 14 days of effluent. As the WWTP will be designed to run continuous, the lagoon(s) will be designed as overflow for effluent or when maintenance of the effluent force main is required. Lagoon(s) will be designed with mowable slopes due to predicted utilization of them requires they will remain dry the majority of the time. The Project shall be located in Fayette, Haywood, and Tipton Counties, Tennessee. Meeting Link: https://tn.webex.com/tn/j.phpMTID=m418f4189915ba7160eaa032a45995971 Call-In Number: (415) 655-0001 Meeting Number (access code): 2301 702 5450 Meeting Password: STREAM (787326, if using a phone)

Award

Water / Sewer

$87,000,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
28
Bidding Soon
396
All Active Projects
166
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2021

March 15, 2022

img_map_placeholder

To Be Determined, Brighton, TN

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.