BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Hertford, North Carolina. Completed plans call for the demolition of a military facility; for the construction of a military facility; for site work for a road / highway; for paving for a road / highway; and water / sewer project.

*Contract Award Date: September 25, 2019 Contract Award Number: N4008519C9163 Contract Award Dollar Amount: 12,912,850.40 Contract Line Item Number: CLINS 0001 thru 0005 Contractor Awardee: Sauer Incorporated (DUNS 078327079) 11223 Phillips Parkway Drive East Jacksonville, FL 32256 This does not constitute a request for proposal, request for quote, or an invitation for bid. The intent of this pre-solicitation synopsis is to inform potential offerors of this requirement. The solicitation number will be N40085-19-R-9163 on the Navy Electronic Commerce Online website (NECO) at https://www.neco.navy.mil/index.aspx. A Vendor User Guide is available for download at the site as well as the NECO Help Desk contact phone number for any issues/questions related to the website. Ensure that you register with the site so you will receive emails applicable to this solicitation in the event of any amendments and/or any changes regarding this solicitation and/or solicitation of interest. The proposed project includes demolition of thirty-one (31) existing magazines at Harvey Point Defense Testing Activity (HPDTA), North Carolina, and construction of ten (10) new 14-foot tall, 80-foot long Army 421-80-08 type MSM Magazines. Construction and demolition will occur in two phases. During construction of each phase, some magazines will be active. Demolition scope consists of 31 existing ECMs, which are constructed of thick steel with steel headwalls, constructed on concrete pads. Electrical and communications will also be demolished. Fences will be partially demolished to construct a temporary contractor entrance for each phase. Demolition includes erosion and sediment control measures and fencing of a stockpile area for storage and processing of demolished materials. Exterior pavement includes asphalt drives and concrete aprons for each magazine. Magazine access from the concrete aprons include fabricated mechanical, adjustable steel ramps adjacent the magazine doors (for each magazine). Each magazine will include heavy steel blast resistant 8 swing doors mounted to a steel frame. Site improvements include low-impact development (LID) features. Grading includes earth cover over the magazines, with a minimum of two feet of cover, and 2:1 side slopes to match grade at the bottom of slope. Stabilizing cover over the magazine earth cover will consist of grass. Site utilities required include power and communications. Underground primary and secondary service, feeders, branch circuit cables include concrete encased, PVC coated, rigid galvanized steel conduit. Foundation work includes driven, square pre-stressed concrete piles (SPPCP) with predrilling of the pile locations prior to pile installation. Intrusion detection systems (IDS) include new security cameras and fiber optic cabling, balanced magnetic switches, processing control unit, motion detectors, and card reader with keypad. Temporary security cameras for the laydown area during construction are required. Power and IDS will be maintained to active magazines during the demolition/construction of each phase. Exterior lighting systems include illumination for exterior building entrances and site operations lighting. Interior lighting must have Class II, Division 1 rating. Security systems also include new fence shake detection system for fencing and gates. The work is located at Harvey Point Defense Testing Activity (HPDTA), 2835 Harvey Point Road, Hertford, North Carolina, approximately as indicated. The exact location will be shown by the Contracting Officer. The estimated construction cost is between $10,000,000 and $25,000,000. The anticipated award of this contract is September 2019. The completion time for this contract is 540 calendar days after award. Large business concerns are required to submit a subcontracting plan prior to award of the contract. The solicitation utilizes source selection procedures which require offerors to submit a technical proposal, Experience, Safety, Past Performance, and a price proposal for evaluation by the Government. The North American Industry Classification System (NAICS) Code for this project is 236220, Commercial and Institutional Building Construction, with a small business size standard of $36.5 million. Pre-Proposal Inquiries: Please submit all pre-proposal questions to Gary Kelley no later than June 24, 2019.

Award

Military

$12,912,850.00

Public - Federal

Demolition, New Construction, Paving, Site Work

39

21

11

11

Subscribe For Documents

75 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
54
Bidding Soon
888
All Active Projects
409
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 18, 2019

November 18, 2019

April 27, 2021

img_map_placeholder

2835 Harvey Point Rd, Hertford, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.