BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 23, 2020 at 7:00 PM

Updated November 19, 2024

Renovation of a water / sewer project in Arlington, Texas. Completed plans call for the renovation of a water / sewer project.

As of November 23, 2020, this project is under construction and is expected to be completed in a year. A construction manager has been selected. The project will address the chemical storage and feed facilities as well as the chemical injection points and residual sampling related work at the John F. Kubala Water Treatment Plant (JKWTP). At the JKWTP, Alum is used as the primary coagulant and coagulant aid polymer (CAP) is added to the process for improving floc formation. The alum and polymer solutions are pumped to the rapid mix basin. Ozone is used in both the raw water and settled water. The settled water ozone application provides primary disinfection. Chlorine is added in the filter gallery to the water leaving the filter complex for additional disinfection and to establish the secondary disinfectant for the distribution system. Caustic is added post-filtration to adjust the pH of the water prior to distribution. Ammonia is fed between the filters and the clearwells into the 84-inch filtered effluent line to form chloramines as the residual disinfectant. Fluoride is also added to enhance dental health. Additional caustic is stored for the chlorine scrubber system.

Under Construction

Water / Sewer

$12,000,000.00

Public - City

Renovation

1138

2

14

7

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
396
Active Projects
202
Bidding Soon
3,769
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2020

October 30, 2020

Project location map

7001 U.S. 287 Frontage Rd, Arlington, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.