EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 9, 2019 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Williston, North Dakota. Completed plans call for site work for a water / sewer project.

**As of April 1, 2019, this project has not yet been awarded. It is expected to be awarded in a couple of weeks. The Work is comprised of one (1) Contract: The Work generally consists of furnishing and installing the following approximate quantities: Contract No. 1 Pipeline Construction: Construction generally consists of furnishing and installing all site work including installation of the following approximate quantities: 27,650 feet of 2.0-inch water pipeline; 28,600 feet 4.0-inch water pipeline; 8,225 feet of 6.0-inch water pipeline; and 24,790 feet of 8.0-inch water pipeline; twenty-five (25) 2.0-inch, 4.0-inch, 6.0-inch and 8.0-inch gate valves; one (1) prefabricated steel vault pump station; one (1) meter/PRV concrete manhole vault; one (1) CR30 process pipe improvements; nine (9) air release valves with PVC pits and curb stops; five (5) 2.0-inch flush hydrant assemblies; five (5) 6.0-inch flush hydrant assemblies; fifty-nine (61) curb stops and frost proof residential meter setter units; 150 feet of 6.0-inch with 10.0-inch POLY cased bore; 18,705 feet of 1.0-inch, 2.0-inch, 4.0-inch, 6.0-inch and 8.0-inch POLY bores; fifty-eight (58) Gas/Oil/Salt Line verifications; twenty-two (22) tie-ins to existing; one temporary pumping system; tracer wire; excavation; backfill; engineered fill; compaction and pressure testing; disinfection, and all associated valves, fittings, and appurtenances; signage; gravel bedding; restoration and seeding. All bids shall be contained in a sealed envelope plainly marked showing that such envelope contains a Bid for the Project. Also refer to Section 00100 for preparation of bid information. Attached to the outside of the bid envelope shall be a separate envelope containing a list of all addenda to the plans and specifications and an acknowledgment by the bidder of receipt of such addenda. The separate envelope shall also contain a bidder's bond in the amount of 5% of the full amount of bid executed by the bidder as principal and by a surety, conditioned that if the principal's bid is accepted and the contract awarded to the principal, the principal, within 15 days after notice of award shall execute a contract in accordance with the terms of the bid and a contractor's bond as required by law and the regulations and determinations of the governing body. Countersignature of a bid bond is not required under this section. All bidders must be licensed for the full amount of the bid as required by Section 47-07-05. A copy of the Contractor's License or Certificate of Renewal thereof, issued by the Secretary of State, must be enclosed in the bid bond envelope as required under Section 47-07-12. Bidders on this work will be required to comply with Title 40 CFR 35.3145(d). The requirements for bidders and contractors under this regulation concern utilization of Minority Business Enterprises (MBE), Women's Business Enterprises (WBE), and Small Business Enterprises (SBE) and are explained in the specifications. The goal for MBE is 2% of the total dollar value of the project. The goal for WBE is 3% of the total dollar value of the project. MBE/WBE Subcontractor Solicitation Information shall be enclosed in the required Bid Bond envelope. Failure to include the form in the Bid Bond Envelope will result in the Bid not being opened. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the specifications. Contracts shall be awarded on the basis of the low Bid submitted by a responsible and responsive Bidder deemed most favorable to the Authority's interest. The Authority reserves the right to reject any and all Bids, to waive any informality in any Bid, to hold all Bids for a period not to exceed sixty (60) days from the date of opening Bids. The Work shall be Complete no later than the following: Contract No. 1 Pipeline Construction: Interim Substantial Completion: July 12, 2019 This work includes all material, installation and testing for the CR37 corridor pipeline that needs relocation for the CR37 County road project. Area includes pipeline routing in sections 22, 34 and 35 in T150N R98W and sections 1 and 2 in T149N R98W. Substantial Completion: October 15, 2019 Final Completion: October 30, 2019 All Bidders are invited to be present at the public opening of the Bids.

Award

Water / Sewer

$2,970,000.00

Public - County

Site Work

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Unit Prices, Contract Modification Procedures, Payment Procedures, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Quality Control, Temporary Facilities and Controls, Construction Facilities, Field Offices and Sheds, First Aid Facilities, Vehicular Access and Parking, Traffic Control, Temporary Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Welded Wire Fabric Reinforcing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Seating, Chairs
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping, Hangers and Supports for Fire-Suppression Piping and Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Facility Sanitary Sewerage, Sanitary Sewerage Pumps, Facility Storm Drainage, Sump Pumps, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems, Swimming Pool Pumps, Fountain Plumbing Systems, Fountain Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Wetlands, Constructed Wetlands, Planting, Planting Preparation, Landscape Grading, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Electrical Utility Transmission and Distribution, Electrical Utility Services, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Common Work Results for Process Piping, Gas and Vapor Process Piping, Liquids Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Piece Material Handling Equipment, Lifting Devices, Slings
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
5
Bidding Soon
46
All Active Projects
27
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Western Area Water Supply Authority (WAWSA) - MCWRD System I Part II - Spring Creek Rural Distribution

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.