BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in North Kingstown, Rhode Island. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

Runway 16-34 Reconstruction at Quonset State Airport - The project generally consists of full depth reconstruction of the entire 7,500 linear feet of Runway 16-34 plus an additional 500-foot overrun, which is currently 150 feet wide with paved shoulders. Reconstruction will include the intersection of Runway 16-34 and Runway 5-23, and all intersecting taxiways. New Runway 16-34 edge lighting, centerline lighting, landing zone lighting, guidance signs, and other airfield electrical infrastructure including duct banks, hand holes and conduit/cabling are included. Stormwater improvements consisting of new drain inlets, drainpipe and significant stormwater Best Management Practices (BMPs) are included with the project. The side safety areas of Runway 16-34 will be re-graded, which will include earthwork (cuts and fills), a new topsoil surface layer and seeding. The completed runway pavement surface will be grooved, and new pavement markings will be applied to all runway and taxiway pavement within the project area . All questions or requests for clarification regarding the bid documents or the project are to be submitted by email to the Office of Procurement via email at procurement@pvdairport.com. The deadline for submission of questions is by 2:00 PM on February 27, 2023. Answers to significant questions received by this deadline or clarifications will be provided to all prospective bidders through addenda posted on the procurement page of the RIAC website at www.flyri.com/riac/procurement site by 2:00 PM on March 3, 2023. DBE participation goal is 9.56%, Goals for minority participation for each trade: 3.0% , Goals for female participation in each trade: 6.9% Bid Schedule 1 o Removal of existing Taxiway A1 in its current location o Construction of Taxiway A1 in its relocated location o Partial reconstruction of Taxiway A2 o Reconstruction of Runway 16-34 o Reconstruction of Runway 34 blast pad o Reconstruction of Runway 34 overrun Schedule 2 o Removal of existing Taxiway A1 in its current location o Construction of Taxiway A1 in its relocated location o Partial reconstruction of Taxiway A2 o Demolition of existing Taxiway A South connector o Construction of Taxiway A South connector o Reconstruction of Runway 16-34 o Reconstruction of Runway 34 blast pad o Reconstruction of Runway 34 overrun

Bid Results

Transportation Terminals

$50,718,681.00

Public - State/Provincial

Paving, Site Work

305

14

62

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
616
Active Projects
268
Bidding Soon
4,205
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2023

August 8, 2023

Project location map

150 Airport St, North Kingstown, RI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.