BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in Austin, Texas. Completed plans call for the addition of a stadium; for the demolition of a stadium; for the renovation of a 200,000-square-foot stadium; and for site work for a stadium.

Construction began in May 2019, and is expected to be completed in August 2021. *The original solicitation is listed below for reference. --- The University of Texas at Austin and The University of Texas at Austin, Office of Capital Planning and Construction (“Owner”) are soliciting statements of qualifications (“Qualifications”) for selection of a Construction Manager at Risk firm for 102-782 Darrell K Royal – Texas Memorial Stadium – South End Zone Addition and Stadium Maintenance and Renovation Project (“Project”), in accordance with the terms, conditions, and requirements set forth in this Request for Qualifications. The University of Texas at Austin seeks to build an expansion to the Darrell K Royal – Texas Memorial Stadium to replace the existing South End zone bleachers and existing video display with a new South End Zone, video display, and renovate portions of the adjacent MoncriefNeuhaus Athletic Center. This project is a part of Texas Athletics’ ongoing efforts to expand and upgrade their current facilities to provide the best facilities and services for their student athletes, fans, and staff with a critical eye to the latest in student athlete safety, well-being, and rehabilitation. The scope of this project is proposed to include new exclusive suites, clubs, open air concourses, restroom facilities, new coaches offices, a banquet kitchen, premium, Loge, and student seating, private game-day parking, branding graphics, Longhorn Network areas, Sports Medicine/Nutrition areas, hydrotherapy, and other support spaces. The preliminary Total Project Cost (TPC) for this project is $140,000,000. The TPC includes a Construction Cost Limitation (CCL) for the Construction Manager at Risk of $100,000,000. Fees, furnishings, equipment, other work, miscellaneous expenses, and contingencies make up the balance of the TPC. Shortlist Confirmed.

Under Construction

Arenas / Stadiums

$175,000,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

70 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
33
Bidding Soon
2,360
All Active Projects
920
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.