Site work for a power facility in West Point, Georgia. Completed plans call for site work for a power facility.

This project is advertised on an unrestricted basis utilizing FAR Part 15 Source Selection Procedures. The North American Industry Classification System (NAICS) Code for this project is 236220. The estimated completion time will be 540 days. The estimated cost range is from 1,000,000.00 to $5,000,000.00. The Mobile District Corps of Engineers has a need for construction of a reinforced concrete wall at three locations immediately downstream of the Unit 4 intake bulkhead at West Point Power House, West Point, Georgia. Each wall is 12'-6" thick, 17' long, and 33' tall. The wall will be tied to the existing powerhouse structure with steel dowels and two water-stops will be installed to insure water tightness. During construction the temperature of the concrete at the time of placement will not be able to exceed 70 degrees (mass concrete pour). Additional challenges include the physical location of these walls and the limited access for construction materials. Two water leaks in the existing west intake concrete bulkhead joint will require piping to discharge the water. The rate of leakage is calculated to be approximately 70 to 90 gallons per minute. No debris of any kind will be allowed to be disposed of in the draft tubes during construction. In order to access Unit 4 intake and redefine the workspace from confined to open, the contractor must remove two pre-stressed double tees that are roughly 8 feet wide by 40 feet long. The contractor shall be responsible for removing the double tees and the construction and subsequent removal of a temporary secondary means of egress. The existing overhead crane in the powerhouse will be available to move construction materials in and out of the Unit 4 cavity. The crane will be operated by government personnel. The contractor shall coordinate the need for the crane and associated logistics with the powerhouse supervisor at least two days prior to the need. Any powerhouse project or maintenance activity requiring the crane takes precedence over the contractor's use of the crane and cannot be used as the basis of a claim. It is anticipated that a firm-fixed price contract will be awarded based on FAR Part 15 "best value" procedures. Note No. 1: All prospective contractors and their subcontractors and suppliers must be registered in Federal Business Opportunities (FedBizOpps) before they will be allowed to download solicitation information. Contractors must be registered in the System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM/ prior to award of this contract. Solicitation documents, plans and specifications will only be available via FedBizOpps. Registration for plans and specifications should be made via FedBizOpps Internet Homepage. If you are not registered, the United States Government is not responsible for providing you with notifications of any changes to this solicitation. The solicitation will be available only as a direct download. This solicitation will not be issued on CD-ROM. Neither telephonic, mailed, nor fax requests will be accepted. Registration should be completed one week prior to the issue date. It is therefore the Contractor's responsibility to monitor the website daily for the solicitation to be posted, and for any posted changes or amendments to this solicitation. The plans and specifications and all notifications of changes to this solicitation shall only be made through this posting and modifications hereto. Plans and specifications will not be provided in a printed-paper format; however, the Government reserves the right to revert to paper medium when it is determined to be in the Government's best interest. NOTE: This solicitation is in .pdf format and requires Adobe Acrobat Reader. Adobe Acrobat Reader may be downloaded free of charge at http://www.adobe.com/products/reader. Note No. 2: All bid forms, bid bonds, and other normal documents required for the bid submittal, including amendments to the bid submittal, shall be electronic format with the proposal. Note No. 3: Critical path method (network analysis system) is not required. Note No. 4: For this job, a small business is defined as having average annual receipts of less than $36,500,000 for the past three years. Note No. 5: It is anticipated that this solicitation will not have bid options. However, optional bid items may be added if it is determined to be in the Government's best interest. Note No. 6: All advertisements of Mobile District projects will be through the Federal Business Opportunities (FedBizOpps). Detailed information on this and other Mobile District Projects (Ordering Solicitations, Points of Contact, Synopsis of Work, etc.) are available on the Internet at: https://www.fbo.gov. Note No. 7: The official solicitation posted to FBO.gov will finalize the Site Visit date and time. All interested contractors are invited and strongly encouraged to attend. The purpose of the site visit is to enhance your understanding of the contract requirements. This scheduled site visit will be the only one offered. Individual requests for site visits will not be granted. Contractors must meet at the project site location at the time and date listed above. Questions asked of government personnel at the conference and government personnel responses shall be non-binding. Official responses will only be made to questions formally submitted to the Bidder's Inquiry Portal in ProjNet at website http://www.projnet.org/projnet. Note No. 8: The request for information (RFI) process for bidder inquiries during the advertisement period will be through the ProjNet internet based system, and specifics will be contained in the RFP solicitation package available exclusively from FedBizOpps. Other forms of communicating RFIs to the Government will not be honored. The Government will try to respond to all questions. However, responses may not be furnished to all questions and particularly those received late in the advertisement period (0-10 days prior to bid opening.) *Some or all of the documents for this project may be controlled unclassified information and property of the United States Government and if so we will not be obtaining them. Users must register with FBO in order to view and obtain controlled unclassified documents.

Award

Power Plant

$1,898,177.00

Public - Federal

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
64
Bidding Soon
996
All Active Projects
462
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2019

April 18, 2019

img_map_placeholder

Multiple Locations, West Point, GA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.