BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Toronto, Ontario. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The scope of the BFPP Assignments includes sewer and storm drainage improvement, including but not limited to sanitary sewer upgrades, storm sewer upgrades, open channels, in line storage (oversized pipes and precast concrete box units etc.), stormwater management facilities (underground storage tanks, wet/dry ponds, artificial wetlands, etc.), low impact development measures, catch basin inlet controls, outfall/outlet control structures and additional associated municipal infrastructure work and appurtenance which may be impacted by these assignments. The Assignments may also include road resurfacing and/or reconstruction, road and/or other right-of-way (ROW) element restoration, other sewer or watermain replacements, lateral services replacements (sewers and watermain), other utility relocation, as required. TIMELINE: The Civil Engineer has completed detailed engineering design for BFPP4 Assignments/Projects. The Consultant will also provide contract administration (DDCA) services for the Assignments as projects are identified to proceed to tender. Projects will be followed once approved for bid. Coverage discontinued. It is the City's intent to assign 2 additional, currently undefined Projects to the Consultant, with an aggregate construction value of up to the difference between the Maximum Construction Cost (MCC) value stipulated in Section 5 of this RFP and the aggregate value of the Projects defined in Appendix E. These additional Projects would be assigned within one year of award of this RFP, once further preliminary designs have been completed and accepted by the City, at the City's discretion; however, the City does not guarantee that the additional Projects will be assigned to the Consultant. These additional Projects would be tendered as 2 additional construction contracts (1 for each Project), each with an estimated construction schedule duration of up to 24 months.

Project Abandoned

Water / Sewer

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
112
Bidding Soon
2,537
All Active Projects
1,004
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.