BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 1, 2022 at 8:00 PM

Updated January 26, 2024

Site work, paving and outdoor lighting for a mixed-use development in Aitkin, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; for outdoor lighting for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

0119-30 (T.H.210=002), 0116-49 (T.H. 169=035) CRRSAA 0122(152) In Aitkin County on T.H. 210 from Ripple River to T.H. 169 North Jct, and on T.H. 169 from North Jct T.H. 210 to Mississippi River Grading, Bituminous and Concrete Surfacing, Lighting, ADA Improvements, Box Culvert and Bridge No. 01006 & 01004 10.714 Miles DBE Goal 3.4 MNDOT - 084 - Grading, Bituminous and Concrete Surfacing, Lighting, ADA Improvements, Box Culvert and Bridge

Award

Bridges / Tunnels

$38,536,110.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

1157

5

8

6

Subscribe For Documents

77 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
19
Bidding Soon
399
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2022

August 23, 2022

Project location map

MN-210, Aitkin, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.