BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Little Egg Harbor Twp, New Jersey. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Replacement of Railroad Avenue Bridge, Structure No. 1508-005, Carrying Railroad Avenue Over Westecunk Creek, Township of Eagleswood. Bidders must comply with P.L. 1975, C. 127 and 10% Surety required. John N. Ernst, Ocean County Engineer. The work to be performed under this Contract consists of the complete replacement of an existing 32.5ft. wide, 45ft. long, two span, simply supported, adjacent reinforced concrete voided slab beam superstructure supported by concrete pile caps on timber piles with timber wing walls, with a single span bridge with prestressed concrete box beams on reinforced concrete stub abutments on concrete filled steel pipe piles. The project proposes a full detour that is to be set in place prior to demolition and then to be removed after the projects completion. Estimated construction cost range: $1,000,000.00 to $5,000,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SCOPE OF WORK The following is added to this Subsection of the Standard Specifications: The work to be performed under this Contract consists of the complete replacement of an existing 32.5ft. wide, 45ft. long, two span, simply supported, adjacent reinforced concrete voided slab beam superstructure supported by concrete pile caps on timber piles with timber wing walls on Railroad Avenue in the Township of Eagleswood, with a single span bridge with prestressed concrete box beams on reinforced concrete stub abutments on concrete filled steel pipe piles. The project proposes a full detour that is to be set in place prior to demolition and then to be removed after the project's completion. Construction will necessitate operations of milling and paving of the existing roadway along with all other work necessary and incidental to the construction of the Railroad Avenue Bridge. It isstrongly suggested that the Contractor visit the site prior to bidding to assesstheir capability of driving all the sheeting and piles per plan along the East side of the roadway with the overhead utility wires in place

Award

Bridges / Tunnels

$2,282,283.00

Public - County

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
466
Active Projects
262
Bidding Soon
3,320
All Active Projects
1,463
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 21, 2022

July 21, 2022

December 19, 2022

img_map_placeholder

Railroad Ave, Little Egg Harbor Twp, NJ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.