Demolition, site work, paving, new construction and renovation of a civil project in Cannon Falls, Minnesota. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a road / highway; road / highway; and road / highway.

https://www.twincities.com/2023/04/13/mndot-announces-more-than-200-construction-projects-for-this-year-including-highway-52/ - Highway 52 Goodhue County The stretch of U.S. Highway 52 that runs along Goodhue County from Zumbrota to Cannon Falls will enter its third and final year of construction this month. Construction began April 10 and includes reconstructing southbound lanes, replacing bridges, installing a snow fence, building a noise wall and improving safety. According to MnDOT, motorists should prepare for lane closures and traffic delays during mornings, evenings and weekends. __________________________________________________________________________ https://kdhlradio.com/highway-52-reconstruction-from-zumbrota-to-cannon-falls-begins/ The Minnesota Department of Transportation (MnDOT) begins a three-year reconstruction project of Highway 52 from Zumbrota to Cannon Falls Tuesday, July 6, 2021. The Highway 60 West overpass bridge at Zumbrota and Highway 52 northbound bridge at the Highway 60 East interchange south of Zumbrota will be replaced this year. Construction crews are beginning prep work at those bridges. Also this month, crews will be constructing nine temporary median crossover lanes to direct traffic off the north or southbound lanes of Highway 52. Twelve temporary right turn lanes will be constructed along Highway 52. Construction of the crossover lanes and turn lanes will begin on the south end of the project. Motorists will not experience traffic impacts during this time. Motorists will encounter some short detours from mid-August through November as crews construct the Highway 60 West overpass bridge at Zumbrota. MnDOT says this year's construction work won't have a high impact on motorists, but will have more of an impact next year and in 2023. The three-year project will reconstruct the southbound Highway 52 lanes from approximately 2 miles south of Highway 19 in Cannon Falls to approximately one mile north of Goodhue County Road 7 with access control improvements. The bridges near Zumbrota will be replaced. A new interchange will be constructed to replace the existing at-grade intersection at Highway 52 and Highway 57/Goodhue County Road 8 which is the Hader interchange. New frontage roads will be constructed along the route and a new Goodhue County Road 14 connection on the north end of the project near Cannon Falls. The project cost is $69.7 million. Bids on the project were opened in February in St. Paul with four bids submitted. Mathiowetz Construction Company of Sleepy Eye was the low bidder. Recently Mathiowetz made a change to the Hader interchange after determining it was more cost-effective for the interchange to go under and not over Highway 52. More information is available on the MnDOT website. __________ The Minnesota Department of Transportation (MnDOT) is scheduled to reconstruct the southbound Highway 52 lanes beginning 2.2. miles south of Highway 19 in Cannon Falls and proceeding south to 1.2 miles north of Goodhue County Road 7 . Additionally, MnDOT is proposing to replace a number of bridges, including the bridges at the junctions of Highway 60 (west) and Highway 60 (east) near Zumbrota. MnDOT will also be investigating intersection improvements at the junction of Highway 57/Goodhue County Road 8 and Highway 52 in Hader. Additional safety and access management measures will be investigated corridorwide during design development. No determinations on the type of intersection improvements or other safety and access management measures have been made. Estimated construction costs: $54 -$60 million For More Information Contact: o Jai Kalsy, District 6 Project Manager, 507-286-7545, jai.kalsy@state.mn.us Or o Mike Dougherty, District 6 Director of Public Engagement and Communications, 507-286- 7684, michael.dougherty@state.mn.us MNDOT - RFP D/B - Southbound TH 52 Improvement Project

Under Construction

Roads / Highways

$60,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
46
Bidding Soon
824
All Active Projects
358
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2021

October 25, 2021

img_map_placeholder

Multiple Locations, Cannon Falls, MN


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.