BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Carroll, Iowa. Working plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

https://images.apollo.ai/articles/pdfs/2879152_44158_03-16-2021.pdf Carroll City officials have approved an $18.9 million city budget for next fiscal year that includes a 3 per-cent increase in residential property taxes. The council voted 6-0 on the measure at a regular ses-sion last week. The city tax bill for a $150,000 home will go from BUDGET FROM PAGE 1 that would include con-struction of a second gym-nasium, a raised walking/ jogging track inside and improved locker rooms. The difference between this plan and the one that failed to clear a ref-erendum in September: the sweeping swimming pool enhancements are removed. The council would rely heavily on local option sales tax revenue for the Rec project so it would not have to issue the level of general- obligation debt financing that triggers a public vote. The Rec Center plan will be financed over a period of years. The city expects to accept a bid in early 2022 on the project. $935.41 to $963.76 -- a $28.35 hike on what is considered a median-valued home in the city. The budget includes an increase in the city's prop-erty tax rate from $11.60 to $11.65 per $1,000 assessed valuation on residential and commercial property. This does not include the Carroll Community School District, Carroll County and Des Moines Area Community College tax askings. Because of the state taxing formula aimed at boosting businesses, the increase in the city commercial tax bills will be less than half a per-cent. Owners of a commer-cial property with an assessed value of $1 million will only see their taxes go up $46.87. The city expects to be more aggressive in streets work in coming years. Some major engineering work is likely to be done in the coming fiscal year associated, with an expected $3 million street-improvement project slated for calendar year 2022 on Adams Street from Sixth Street to 13th Street. The budget document features a $7.3 million Rec Center modernization project __________ The street segments selected for 2018 rehabilitation are as follows: Bluff Street: Main Street to Walnut Street (1,875 feet) East Street: 1st Street to 2nd Street; 7th Street to 10th Street (1,650 feet) West Street: 1st Street to 3rd Street (820 feet) Water High Service Pumping Station Parking Lot, 123 W. Bluff Street Specific improvement items will include full-depth patching, curb replacement, driveway replacement, accessibility improvements (sidewalk ramps), minor storm sewer improvements, fixture adjustments (manholes, valves, and hydrants), pavement milling/scarification, hot mix asphalt resurfacing and seeding, mulching, and fertilizing. It is estimated that 63 existing and 10 new destination sidewalk ramps will or may be included in the project. Current SUDAS design standards, specifications, and Carroll Supplemental Specifications will provide the design guidelines for this locally funded project. Copies of the SUDAS Standard Specifications are not included in the contract documents but are incorporated by reference. The contractor shall fully complete seeding no later than September 30, 2018, and shall substantially complete the project no later than November 2, 2018. As of June 20, 2023, no rebid information available

Final Planning

Roads / Highways

$750,000.00

Public - County

Paving, Site Work

57

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
61
Bidding Soon
676
All Active Projects
350
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2018

November 27, 2023

img_map_placeholder

Multiple Locations, Carroll, IA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.