Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Carroll, Iowa. Working plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
https://images.apollo.ai/articles/pdfs/2879152_44158_03-16-2021.pdf Carroll City officials have approved an $18.9 million city budget for next fiscal year that includes a 3 per-cent increase in residential property taxes. The council voted 6-0 on the measure at a regular ses-sion last week. The city tax bill for a $150,000 home will go from BUDGET FROM PAGE 1 that would include con-struction of a second gym-nasium, a raised walking/ jogging track inside and improved locker rooms. The difference between this plan and the one that failed to clear a ref-erendum in September: the sweeping swimming pool enhancements are removed. The council would rely heavily on local option sales tax revenue for the Rec project so it would not have to issue the level of general- obligation debt financing that triggers a public vote. The Rec Center plan will be financed over a period of years. The city expects to accept a bid in early 2022 on the project. $935.41 to $963.76 -- a $28.35 hike on what is considered a median-valued home in the city. The budget includes an increase in the city's prop-erty tax rate from $11.60 to $11.65 per $1,000 assessed valuation on residential and commercial property. This does not include the Carroll Community School District, Carroll County and Des Moines Area Community College tax askings. Because of the state taxing formula aimed at boosting businesses, the increase in the city commercial tax bills will be less than half a per-cent. Owners of a commer-cial property with an assessed value of $1 million will only see their taxes go up $46.87. The city expects to be more aggressive in streets work in coming years. Some major engineering work is likely to be done in the coming fiscal year associated, with an expected $3 million street-improvement project slated for calendar year 2022 on Adams Street from Sixth Street to 13th Street. The budget document features a $7.3 million Rec Center modernization project __________ The street segments selected for 2018 rehabilitation are as follows: Bluff Street: Main Street to Walnut Street (1,875 feet) East Street: 1st Street to 2nd Street; 7th Street to 10th Street (1,650 feet) West Street: 1st Street to 3rd Street (820 feet) Water High Service Pumping Station Parking Lot, 123 W. Bluff Street Specific improvement items will include full-depth patching, curb replacement, driveway replacement, accessibility improvements (sidewalk ramps), minor storm sewer improvements, fixture adjustments (manholes, valves, and hydrants), pavement milling/scarification, hot mix asphalt resurfacing and seeding, mulching, and fertilizing. It is estimated that 63 existing and 10 new destination sidewalk ramps will or may be included in the project. Current SUDAS design standards, specifications, and Carroll Supplemental Specifications will provide the design guidelines for this locally funded project. Copies of the SUDAS Standard Specifications are not included in the contract documents but are incorporated by reference. The contractor shall fully complete seeding no later than September 30, 2018, and shall substantially complete the project no later than November 2, 2018. As of June 20, 2023, no rebid information available
Final Planning
Roads / Highways
$750,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2018
November 27, 2023
Multiple Locations, Carroll, IA
Related To This Project
Carroll, IA
Bid Date: Dec 20 2022
Carroll, IA
Bid Date: Jun 22 2022
Carroll, IA
Bid Date: Dec 13 2022
Carroll, IA
--
Carroll, IA
Bid Date: Mar 15 2022
Carroll, IA
Bid Date: Mar 22 2022
Carroll, IA
Bid Date: Apr 19 2022
Carroll, IA
Bid Date: Jun 01 2022
Carroll, IA
Bid Date: Nov 15 2022
Carroll, IA
Bid Date: Nov 22 2022
Carroll, IA
Bid Date: Oct 24 2022
Fort Dodge, IA
Bid Date: Aug 04 2021
Ames, IA
Bid Date: May 31 2023
Des Moines, IA
Bid Date: Feb 08 2022
Onawa, IA
Bid Date: Jun 17 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.