Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 10, 2019 at 8:00 PM
Updated September 11, 2025
Renovation of a water / sewer project in Bracebridge, Ontario. Completed plans call for the renovation of a water / sewer project.
For the supply and installation of components related to Sewage Treatment Plant Headworks Upgrades and modifications. - Supply and installation of two (2) Claro mechanical step screens and stainless-steel screen tanks; - Two (2) Claro wash press compactors and associated discharge piping; - Two (2) Claro mechanical vortex grit chambers complete with associated piping and components; - Two (2) Claro spiral grit classifiers complete with hydrocyclones, piping and components; - Two (2) Claro parshall flume flow meters; - Two (2) 7.5 HP grit slurry pumps; - Piping modifications, including the installation of valves, piping and related equipment as described in the plans and specifications; - Supply and installation of three (3) 70 HP high-lift pumps and related pumping chamber; - Supply and installation of two (2) 7.5 HP overflow pumps and related lift station; - Supply and installation of four (4) HDPE DR 17 forcemains each approximately 50 m in length including 100 mm dia., 250 mm dia., 300mm dia., and 600 mm dia.; - Supply and installation of a steel trussed roof as described in the plans and specifications; - Building expansion and modifications including the addition of a washroom/shower room, mechanical room and an electrical and control room including PLC, MCC, Controls, and switch gear; - Supply and installation of pad mounted electric generator including foundation; - Steel fabricated channel work and associated components. - Steel fabricated support frames, catwalks, stairs and railings. - Supply and installation of two (2) treated water booster pumps and associated valves and fittings to provide necessary service water throughout the plant. - Supply and installation of a pad mounted septage receiving system. - Supply and installation of two (2) activated carbon odour treatment systems complete with all required ducting and pipe work. - Supply and installation of a new heating and ventilation system including ten (10) hot water unit heaters and two (2) fire tube boiler units complete with piping and valving. - All related regulatory agency requirements; - All other required work and work that is described in the plans and specifications in the Proposal documents.
Post-Bid
Water / Sewer
$6,714,875.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 14, 2019
August 12, 2019
1000 Lagoon Ln, Bracebridge, ON
Related To This Project
Bracebridge, ON
Bid Date: Oct 14 2025
Bracebridge, ON
Bid Date: Dec 01 2025
Bracebridge, ON
Bid Date: Dec 01 2025
Bracebridge, ON
Bid Date: Dec 11 2025
Bracebridge, ON
--
Bracebridge, ON
Bid Date: Sep 26 2025
Bracebridge, ON
Bid Date: Jun 04 2020
Bracebridge, ON
Bid Date: Sep 04 2025
Bracebridge, ON
Bid Date: Aug 20 2025
Bracebridge, ON
Bid Date: Aug 11 2025
Bracebridge, ON
Bid Date: Aug 07 2025
Bracebridge, ON
Bid Date: Jul 04 2025
Bracebridge, ON
Bid Date: Jul 31 2025
Bracebridge, ON
Bid Date: Jun 06 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
