BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a bridge / tunnel in Miami, Florida. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Here's one idea to relieve downtown traffic: Dig a tunnel under the Miami River Six tunnel concepts developed by the Miami-Dade Transportation Planning Organization were recently examined at a Downtown Development Authority meeting. The group was opposed to designs that would cause dramatic trenching for huge entrance and exit ramps on Brickell Avenue, but supported tunnel alternatives that would maintain "pedestrian connections along key downtown corridors." In its feasibility study, the county recommended the option of two stacked bored tunnels with two upper northbound lanes and two lower southbound lanes to compensate for cramped space. Its north portals would be on Biscayne Boulevard, in the vicinity of Northeast Fourth and Second streets, where it would slope down beneath the foundation of the Metromover tracks, make its way southward, take a right turn at the river to continue under the bridge and avoid the Miami Circle, and emerge on Brickell Avenue with its south portals near Southeast 10th and 12th streets. The length of the tunnel, including portals, would be 2.1 miles, about the same as the PortMiami tunnel. "When we evaluated the pros and cons, that concept was the most feasible," said Jesus Guerra, deputy director of the transportation planning organization. "It provides a connection between Biscayne Boulevard and Brickell, avoids digging large ramps in the center of downtown, does not affect ships and cargo on the river and allows for placement of the boring machine." The cost would be $900 million and construction would take 4 to 4 1/2 years. The county's results were presented to the Florida Department of Transportation, which will conduct its own Traffic Analysis and Constructability Study. As of May 31, 2022, this project is in the conceptual phase. A consultant completed a feasibility study in 2017. The project is pending owner review. A firm timeline for construction has not been established. The method of contractor selection has not been determined at this time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Bridges / Tunnels

$900,000,000.00

Public - State/Provincial

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
123
Bidding Soon
1,775
All Active Projects
772
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.