Renovation of a military facility in Norfolk, Virginia. Completed plans call for the renovation of a 39,000-square-foot military facility.
As of March 26, 2019, this design-build project is still in the design pre-construction phase. Construction is expected to commence third quarter 2019. As of November 15th, 2018 this project is still in design. Construction is expected to begin spring 2019. Contract Award Date:September 25, 2018 Contract Award Number:N4008518F7055 Contract Award Dollar Amount:2,968,484.00 Contractor Awardee:Turner Strategic Technologies, LLC (DUNS 808285022) 7440 Central Business Park Drive Norfolk, VA 23513 This project will renovate approximately 39,000 gross square feet of operational storage space in Warehouse SDA-216. The work consists of demolishing/removing and re-installing new modular offices, restrooms and workstations. The majority of the work will repair the slab, exterior closure (roof, windows, insulation), interiors, plumbing, HVAC, fire protection/suppression systems and upgrading all the electrical components as needed. Location of the work: Naval Support Activity Hampton Roads in Norfolk, Va. Description of the work: This project will renovate approximately 39,000 gross square feet of operational storage space in Warehouse SDA-216. The work consists of demolishing/removing and re-installing new modular offices, restrooms and workstations. The majority of the work will repair the slab, exterior closure (roof, windows, insulation), interiors, plumbing, HVAC, fire protection/suppression systems and upgrading all the electrical components as needed. Estimated Budget Amount: The magnitude of construction is between $1,000,000.00 and $5,000,000.00. NAICS Code: 236220 Time for completion: All work shall be completed within 546 calendar days after award (15 days will be added for receipt and processing of bonds.) Wage Determination: General Decision Number: VA180171 05/18/2018 VA171 Liquidated damages: $2,400.00 Per Calendar Day Utilities: Utilities will be charged to the Contractor as follows: Electric $118.10 per MWH Gas $6.16 per MBTU Water $20.35 per KGAL Wastewater $20.48 per KGAL Steam $45.44 per MBTU Record Shop Drawings: Reproducible copies required. Government Furnished Property: No Government Furnished Property. Basis for Award: Lowest Price Bid Guarantee: Shall be in a penal sum equal to at least 20 percent of the largest amount for which award can be made under the bid submitted, but in no case to exceed $3,000,000. Offerors who determine that the technical and/or contractual requirements of this solicitation require clarification(s) in order to permit submittal of a responsive proposal shall submit all inquiries in writing using the PPI form (Attachment A). All inquiries shall be submitted via email to Malita Smith at malita.smith@navy.mil no later than Tuesday, June 12, 2018 at 2:00 PM local time. Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your consultants are not duplicates. A response will be published via an amendment. Proposal Acceptance Period: 120 Days from receipt of offers
Award
Military
$2,968,484.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 13, 2018
August 26, 2019
Ingram St, Norfolk, VA
Related To This Project
Norfolk, VA
Bid Date: Jun 28 2024
Norfolk, VA
Bid Date: Aug 01 2024
Norfolk, VA
Bid Date: Aug 02 2024
Norfolk, VA
Bid Date: Jul 25 2024
Norfolk, VA
Bid Date: Aug 12 2024
Norfolk, VA
--
Norfolk, VA
Bid Date: Jul 30 2024
Norfolk, VA
Bid Date: Jul 30 2024
Norfolk, VA
Bid Date: Jul 01 2024
Norfolk, VA
Bid Date: Jul 16 2024
Norfolk, VA
Bid Date: Jul 02 2024
Norfolk, VA
Bid Date: Jul 11 2024
Norfolk, VA
Bid Date: Jul 30 2024
Norfolk, VA
Bid Date: May 27 2021
Norfolk, VA
Bid Date: Jun 28 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.