BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Site work and paving for a mixed-use development in Lexington Park, Maryland. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Update:Project includes the infrastructure improvements to the Southampton Subdivision in conjunction with preservation and revitalization efforts in the immediate area, which will provide new and/or reconstructed infrastructure (storm drainage and street improvements) for over 6,700 linear feet of existing roadways where substandard, deteriorated, or no infrastructure exists. Upgrades include approximately 6,715 linear feet of roadways that are anticipated to be designed at one time, but constructed in several phases. Reconstruction costs for the rehabilitation work are based on experience with the Patuxent Park Neighborhood Preservation Program project. Phase 1 includes a portion of Lincoln Avenue and Southampton Drive, Bristol Avenue, and Windsor Drive (2,165 lineal feet) with construction funding in FY2023. Phase 2 includes a portion of Lincoln Avenue and Southampton Drive, Cambridge Avenue, Brighton Avenue (2,364 lineal feet ) with construction funding in FY2025. Phase 3 includes a portion of Lincoln Avenue and Thurman Davis Lane (2,186 lineal feet) with construction funding in FY2027. Due to narrow road right-of-way widths (30' wide) on most streets, additional property acquisition for fee/easement areas is needed as ex. curb and sidewalks are located on many properties along the roadways. Following the completion of design, additional property acquisition for Phase 1 will begin in FY2022 with construction to begin in FY2023. FY2024-Contingency increase/price escalation. FY2025 & FY2027 price escalation 10% increase. Project is included in St. Mary's County Fiscal Year 2026-2030 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Project includes the infrastructure improvements to the Southampton Subdivision in conjunction with preservation and revitalization efforts in the immediate area, which will provide new and/or reconstructed infrastructure (storm drainage and street improvements) for over 6,700 linear feet of existing roadways where substandard, deteriorated, or no infrastructure exists. Upgrades include approximately 6,715 linear feet of roadways that are anticipated to be designed at one time, but constructed in several phases. Reconstruction costs for the rehabilitation work are based on experience with the Patuxent Park Neighborhood Preservation Program project. Phase 1 includes a portion of Lincoln Avenue and Southampton Drive, Bristol Avenue, and Windsor Drive (2,165 lineal feet) with construction funding in FY2023. Phase 2 includes a portion of Lincoln Avenue and Southampton Drive, Cambridge Avenue, Brighton Avenue (2,364 lineal feet ) with construction funding in FY2025. Phase 3 includes a portion of Lincoln Avenue and Thurman Davis Lane (2,186 lineal feet) with construction funding in FY2027. Due to narrow road right-of-way widths (30' wide) on most streets, additional property acquisition for fee/easement areas is needed as ex. curb and sidewalks are located on many properties along the roadways. Following the completion of design, additional property acquisition for Phase 1 will begin in FY2022 with construction to begin in FY2023. FY2024-Contingency increase/price escalation. FY2025 & FY2027 price escalation 10% increase. This project is included in the county's 2025-2029 Capital Improvement Program (CIP). As of July 11, 2025, further details regarding construction and completion timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The contact(s) will not accept phone call inquiries at this time. *Absolutely no inquiries will be accepted at this time. Unsolicited inquiries may result in disqualification in any future bidding opportunities.

Conceptual

Roads / Highways

$4,754,310.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
426
Active Projects
176
Bidding Soon
2,908
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

Multiple Locations, Lexington Park, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.