BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Chandler, Arizona. Conceptual plans call for site work for a water / sewer project.

Improvements to the storm drainage system within the central Chandler area are needed to provide for increased flood control and efficiency. Such improvements are detailed in the 2006 Stormwater Master Plan Update and the Downtown Chandler Drainage Improvements Candidate Assessment Report (CAR) completed in June 2010. Improvements include the installation of approximately 1,000 linear feet of 36" storm drain pipe along Galveston Street from Hamilton Street to Exeter Street, and 1,000 linear feet of 42" storm drain pipe along Erie Street from Hamilton Street to Exeter Street. These drains will drain into the existing Detroit Basin (Gazelle Meadows Park) at Exeter Street. In addition, approximately 1,500 linear feet of 36" storm drain is needed from Ivanhoe Street south to Galveston Street along the east side of the railroad tracks and will empty into the Detroit Basin. Approximately 1,500 linear feet of new 48" storm drain pipe will originate at the southwest corner of the Detroit Basin and connect to the existing Chandler Boulevard storm drain. The project was selected as a recommended project via the Flood Control District of Maricopa County (FCDMC) Capital Improvement Program Prioritization process in 2008, with a 50/50 cost sharing. As of June 9, 2022, this project is included in the City of Chandler's FY 2022-2031 CIP. Project is under design. Information regarding a design team and the contractor selection has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2022-2023 and 2023-2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$5,366,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
16
Bidding Soon
715
All Active Projects
263
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

img_map_placeholder

Multiple Locations, Chandler, AZ


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.