BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Pleasanton, California. Completed plans call for site work for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Reference Number 0000343215 The City requires all parties interested in this bid opportunity to email the City and request to be added to the plan holder list. See Notice to Bidders for more information. The City of Pleasanton proposes to construct a southbound right-turn lane along Hopyard Road at the Owens Drive intersection. On the south side of the Hopyard Road/Owens Drive intersection, modifications include adding a second northbound left-turn lane and eliminating the northbound free right-turn lane. This project also includes adding a southbound bike lane to close the existing bike lane gap from the I-580 eastbound off-ramp intersection to 180 feet south of Owens Drive. The proposed improvements within State right of way require an encroachment permit from Caltrans. This work will consist of, but is not limited to, traffic control, temporary striping, excavation of existing roadway and concrete sidewalks, driveways, and medians, landscaping and irrigation modification, tree removal, drainage systems, installation of concrete sidewalks, curbs, driveways and sound wall, cold planning, HMA overlay, slurry seal, sealcoat, pavement delineation, modifying lighting system and installation of traffic signal system. The Engineer's cost estimate for the project is $3.5 million. There will be no pre-bid meeting for this project. Question Deadline 03/13/2024 at 5:00 PM PT Questions are submitted online No General Requirements - Certified Payroll - Contractors License Required - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10% - Performance Bond 100% - Maintenance Bond 10% - Labor and Materials Bond 100%

Bid Results

Roads / Highways

$4,183,298.00

Public - City

Paving, Site Work

39

8

14

5

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
89
Bidding Soon
1,909
All Active Projects
799
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2024

July 1, 2024

img_map_placeholder

Hopyard Rd & Owens Dr, Pleasanton, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.