EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 20, 2019 at 8:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Cincinnati, Ohio. Completed plans call for the renovation of a water / sewer project.

As of February 1, 2019 project has not been awarded yet. Award information will be available after a month or so. The objective of the Project is to complete construction of a new Diversion Chamber. Construction must be completed by December 31, 2019 to comply with an existing Consent Decree. Ideally, the Project will include construction of connections to the Mill Creek Interceptor and Mill Creek Auxiliary Interceptor. However, all planning, design, permitting and construction work must be completed within the available $7.15M budget. As a result, some of the inter-connections may need to be deferred to a later date, with only stub-outs provided. In that event, MSD may elect to amend the Contract to construct the interconnections at a later date pending funding availability. Because of these budget constraints, the scope of Work will include design-to-budget analyses to optimize the work that MSDGC can complete within the available budget

Award

Water / Sewer

$7,150,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
77
Bidding Soon
1,220
All Active Projects
590
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2018

March 29, 2019

img_map_placeholder

To Be Determined, Cincinnati, OH

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.