Demolition, site work, paving and new construction of a bridge / tunnel in Seattle, Washington. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of December 20, 2023, the Planning and Environmental Linkages study is underway and will continue through 2025. NEPA/ SEPA environmental review is anticipated to begin in 2025. The environmental review, design and construction timeline will largely depend upon the results of the planning phase but is not anticipated to begin until 2027 and be completed until 2029. The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide Preliminary Engineering and Environmental Review support for the SR160/Fauntleroy Terminal - Trestle and Transfer Span Replacement Project. One (1) agreement may be awarded. The agreement will be approximately four (4) years in duration. The agreement amount will be approximately $6.5 million. WSDOT reserves the right to supplement the agreements for additional time and money. The Washington State Department of Transportation Ferries Division - Washington State Ferries (WSF) is initiating the Preliminary Engineering and Environmental Review phase of the SR160/Fauntleroy Terminal - Trestle and Transfer Span Replacement Project. The purpose of the project is to address the deficiencies of the aging and seismically vulnerable Fauntleroy terminal in West Seattle in order to maintain safe, reliable, and efficient service and connections to Vashon Island, Southworth, and communities on the Kitsap Peninsula and beyond. The terminal provides a critical transportation link in the region, serving close to three million riders in 2017 and experiencing some of the largest growth in the system. With a total budget of $93 million, the project is included in the Transportation Plan approved by the Legislature in 2018; it is expected to be operationally complete by 2027. UDBE, SBE, or MSVWBE Participation This agreement will be subject to a 6% UDBE goal. The selected consultant will be required to submit a UDBE Written Confirmation Form for approval prior to commencement of work. WSDOT encourages disadvantaged, small, minority, veteran and women-owned consultant firms to respond to this RFQ. WSDOT reserves the right to ask for additional qualifying information, conduct interviews and/or select the highest scoring consultant(s) from the written qualification packets received as a result of this RFQ. Any questions regarding this RFQ should be directed to WSDOT's Headquarters Consultant Services Office at CSOSubmittals@wsdot.wa.gov or 360-704-6397. The method of contractor selection has not been determined at this time. WSDOT - SR 160/Fauntleroy Terminal - Trestle and Transfer Span Replacement Project

Conceptual

Bridges / Tunnels

$6,500,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
30
Bidding Soon
897
All Active Projects
381
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.