BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

New construction of a mixed-use development in Maple, Ontario. Design plans call for the construction of a transportation facility.

Construction of a subway station with Commuter Parking Lot and Passenger Pick-Up/Drop-Off Facility at Langstaff Station at surface level between Highway 7 and Highway 407 in Markham. The station previously referred to as Langstaff in previous proposals now moves east and slightly north, to be built at surface level between Highway 7 and Highway 407. This station is tentatively called Bridge Station. It will provide a convenient connection to the Richmond Hill GO train line and many local and GO Transit bus services. It will also link the Richmond Hill Centre and Langstaff Gateway urban growth centres, at roughly the midpoint of each. TIMELINE: The architect is undertaking completion of the preliminary design to 30 percent. The scope of work is being finalized. As of early March 2023, Metrolinx announced the started construction on the early works at the TTC's Finch Subway Station, before major construction on the YNSE can begin. The upgrades at Finch Station move the Yonge North Subway Extension closer to the construction stage and keep the project running smoothly. The Request for Proposals was issued to Shortlisted Teams for the Yonge North Subway Extension Tunnelling Contract as of December 2023. Future calls for design build consortia to provide detailed design and working drawings and manage construction are expected late 2024. The awarded design build consortia will provide detailed design and working drawings and manage construction. Tender and construction timing will be finalized in 2025 pending funding allocation.

Design

Transportation Terminals

$51,000,000.00

Public - City

New Construction

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
456
Active Projects
245
Bidding Soon
4,505
All Active Projects
1,761
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 3, 2025

August 3, 2026

img_map_placeholder

Multiple Locations, Maple, ON


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.