BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Temecula, California. Completed plans call for paving for a road / highway; for site work for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of May 10,2021 This project has not yet been awarded. A timeline for award has not yet been established.** Furnish and install traffic signal system on Temecula Parkway at Wabash Lane complete and in place, including internally illuminated street name signs, safety lighting, emergency vehicle pre-emption, traffic signal loop detectors, signing, striping, modification to existing curb ramps, and modification to existing medians. Construct an access road off of Temecula Parkway at Wabash Lane to the existing park and ride facility that is located just east of La Paz Road, close off access to the park and ride facility at Vallejo Avenue, and reconfigure a portion of the east end of the existing park and ride site to accommodate the access road. Work includes excavation and fill, grading, construction of storm drain improvements, curb and gutter, sidewalk, asphalt concrete pavement, retaining walls, fencing, signing and striping, landscape and irrigation, and construction surveying. REQUIREMENT TO MITIGATE THE SPREAD OF COVID-19 The Contractor and all subcontractors for the Work shall comply with all applicable Federal, State, Riverside County, and City of Temecula statutes, regulations, orders, and ordinances. This requirement specifically includes, without limitation, compliance with the Safety and Health Guidance COVID-19 Infection Prevention in Construction issued by the California Department of Industrial Relations, Division of Occupational Safety and Health and Safety on July 20, 2020 and as may be amended from time to time by the Department, relating to mitigating the transmission of COVID-19 on the project site and mitigating the transmission of COVID-19 by employees or workers of Contractor and its subcontractors in their contacts with City employees and consultants. Prior to the pre-construction meeting, the Contractor shall submit to the City a COVID-19 Mitigation Program implementing these requirements and shall post the COVID-19 Mitigation Program on the project site in a manner designated by the Citys Project Manager. The failure of employees or workers of the Contractor and all subcontractors on the Work to comply with these requirements shall be a default per Section 6-7.1. Contractor acknowledges that, in the event that the Engineer suspends the Work as a result of such failure by Contractor or one of its subcontractors to comply with these requirements, City is not responsible for the delay, and the Contractor is not entitled to compensation pursuant to Section 6-4.3. The Contractor shall also pay to the City the costs and expenses incurred by the City resulting from the failure of employees of the Contractor and all subcontractors on the Work to comply with these requirements including, but not limited to, the salaries and benefits for City employees who are unable to work, and workers compensation benefits and expenses. Delays in the Work resulting from Contractors or its subcontractors failure to cmply with these regulations shall not be considered an unforeseen event entitling Contractor to an extension of time or payment for delay pursuant to Section 6-4 of the Standard Specifications. Online Q&A Yes Q&A Deadline 04/21/2021 5:00 PM (PDT) Response Types Line Items Proposal (required) Bid Bond Type of Award Lump Sum Pre-Bid Meeting No Bid Valid 90 days Liquidated Damages $1,000.00 per day Start/Delivery Date TBD Project Duration 120 working days

Award

Roads / Highways

$901,846.00

Public - City

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
138
Bidding Soon
2,324
All Active Projects
1,073
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2021

May 28, 2021

img_map_placeholder

Multiple Locations, Temecula, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.