BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2025 at 8:00 PM

Updated August 19, 2025

Renovation of a conference / convention center in Anaheim, California. Conceptual plans call for the renovation of a conference / convention center.

UPDATE : Some lighting and door access systems require upgrades to address the security needs of the facility, to improve controlled access within the building. This project is scheduled to begin in FY 2026/27 and will be phased over six years. The lighting control system, comprised of GE total control and Lutron systems, will be upgraded for the majority of the campus excluding ACC North. This lighting control will update the current network infrastructure and consistency of product. Projects planned for FY 2027/28 and beyond include: -Updates to the Grand Plaza River of Blue light fixtures to replace and upgrade fixtures. -Replacement of the high intensity discharge lighting (HID) in the halls with more efficient 150-watt LED’s which may include short term payback, return on investment, and decreased utility costs. Project is in City of Anaheim capital budget fy 2025-2026 CIP ____________________________________________________________________ Some lighting and door access systems require upgrading to address the security needs of the facility, improving controlled access within the building. This project is being rescheduled to FY 2024/25 and will be phased over six years, now ending in FY 2029/30. The lighting control system comprised of GE total control and Lutron systems will be upgraded for the majority of the campus, excluding ACC North. This lighting control will update the current network infrastructure and consistency of product. Projects planned for FY 2027/28 and beyond include (1) the updating of the Grand Plaza River’s blue light fixtures, and replacing with fixtures that are weather resistant and able to withstand being submersed, and (2) replacing the high intensity discharge lighting (HID) in the halls with more efficient 150 watt LED’s which may include short term payback, return on investment, and decreased utility costs. Project is included in the City of Anaheim's FY 2024-2028 CIP. As of July 1, 2024, information regarding a design team and a general contractor is not available. Funding is anticipated from 2024 to 2028.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Conference / Convention Centers

$1,040,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
665
Active Projects
298
Bidding Soon
3,682
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.