Site work for a water / sewer project in Mobile, Alabama. Working plans call for site work for a water / sewer project.

Addendum No. 7 issued 3/28/2019 Bid Opening rescheduled to 6/3/2019 same time and location. Prequalification of Contractors and for Bids from Bidders that are Prequalified Prequalification Proposals (Letters of Interest (LOI) and Statements of Qualifications (SOQ)) from General Contractors (Construction Service Firms) Contract No. 160039, THREE MILE CREEK TRUNK SEWER UPGRADES, GMC Project No. CMOB160039 for consideration of approval to bid this project. Contract No. 160039, THREE MILE CREEK TRUNK SEWER UPGRADES, GMC Project No. CMOB160039 for consideration of approval to bid this project. Prequalified Bidders will be notified in writing on or about September 10, 2018, at which time Bid and Construction Documents will be made available to bidders. Instructions for SOQ packages may be inspected at the Board's offices at 4725 Moffett Road, Suite A, Mobile, AL, or requested at the offices of Goodwyn, Mills and Cawood, Inc., Consulting Engineers, 11 North Water Street, Suite 15250, Mobile, AL 36602 Attn: Ashley Morris 251.460.4006 ashley.morris@gmcnetwork.com. For the list of plan qualification request holders on this project. As one of the conditions of submitting a SOQ, it must be understood that knowledge and experience is extremely important. Therefore, the construction firm will have to submit evidence and proof acceptable to the Board of their ability, knowledge, experience, training of supervisory personnel and labor, and will be required to submit evidence and proof that construction firm has performed work of a similar nature within the last twenty-four (24) months and that such work was satisfactorily and safely completed. Qualifications of any sub-contractor(s) used to obtain prequalification status are to be included in the firm's statement of qualifications. Contractors should pay special attention to the Board's Supplier Diversity Program requirements to ensure prequalification packages include the required documentation as to participation of diverse sub-contractor(s) and suppliers to meet the Board's goals of the Contractor's good faith efforts to secure such participation. The Owner reserves the right to reject any or all proposals, to waive technical errors, and/or abandon this process if, in their judgment, the best interests of the Owner will thereby be promoted. All General contractors seeking prequalification status are required to submit the prequalification documents enclosed and clearly marked on the outside of the package as follows: "CONFIDENTIAL STATEMENT OF QUALIFICATIONS THREE MILE CREEK TRUNK SEWER UPGRADES," Board of Water and Sewer Commissioners of the City of Mobile, Alabama ATTN: Douglas L. Cote, PE, Assistant Director of Operations, 4725 Moffett Road, Suite A, Mobile, AL 36618-0249. The Work of the project includes, but is not limited to the following: The construction of approximately eleven thousand (11,000) linear feet of sixty inch (60") gravity trunk sewer main and manholes, reconnection of existing branch mains to the new trunk sewer, three (3) double barrel depressed sewers, including one crossing of Three Mile Creek, 96" steel casing installation at roadway crossings, and all related appurtenances. The project is located on the south side of Three Mile Creek just north of Mobile Street, continues on the south side of the creek until a crossing just west of Stanton Road, and remains on the north side of Three Mile Creek until the tie-in to the new diversion box (by others) at the Board's Severe Weather Attenuation Tank (SWAT) west of St. Stephen's Road. DBE 16-01 Disadvantaged Business Enterprise Policy for Public Works Act Contracts, which states that contractors shall make a demonstrated good faith effort to award fifteen percent (15%) of the contract amount to certified Disadvantaged Business Enterprises as subcontractors and/or suppliers performing commercially useful functions which are consistent with contract requirements. Further information for requirements during the bidding and contract performance phases are provided in Policy No. DBE 16-01 and should be considered by prospective bidders. Also, bidders must list all DBE subcontractors and suppliers on the provided Subcontracting Plan form to be submitted with the package. Bids must be submitted on the standard forms included with the Contract Documents. The following contract bid documents, Bid Proposal, Bid Bond, Subcontracting Plan, SSO and Unpermitted Discharge Prevention Notification, and any addendum attachments shall be printed on yellow color paper and tabbed. The Contractor shall be responsible for preparing its bid package in accordance with this guideline. Envelopes containing bids must be sealed and delivered to the Director, Board of Water and Sewer Commissioners of the City of Mobile, Alabama, 4725A Moffett Road, Mobile, Alabama 36618-0249: "Bid for Constructing Contract No. 160039, Three Mile Creek Trunk Sewer Upgrades, GMC Project No. CMOB160039, to be opened at 12:30 p.m., Local Time, October 8, 2018". The Bidder's Alabama State Contractor's License Number and discipline shall be on the envelope. Bid guarantee in the form of certified check, bid bond, or Irrevocable Letter of Credit acceptable to the Board will be required for the bid amount, not to exceed $50,000. The Board reserves the right to reject any and all bids and to waive any informality in bids received

Final Planning

Water / Sewer

$500,000.00

Public - City

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
33
Bidding Soon
486
All Active Projects
227
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2019

September 3, 2019

img_map_placeholder

To Be Determined, Mobile, AL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.