Published July 10, 2024 at 8:00 PM

Updated July 11, 2024

Site work and paving for a road / highway in Durham, North Carolina. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of July 10, 2024, both the R. Kelly Bryant Bridge Trail project and the Third Fork Creek Trail-Phase II project are in design. An engineer has been selected. A timeline for bid advertisement has not been disclosed. The Third Fork Creek Trail--Phase II project is anticipated to begin construction in January 2026. The R. Kelly Bryant Bridge Trail project is anticipated to begin construction in June 2026. The original solicitation is preserved below for reference. R. Kelly Bryant Bridge Trail This bicycle and pedestrian trail will be approximately 3 miles long. It will connect the existing Rocky Creek Trail on Dakota Street north to the Drew/Granby Park located on Drew Street in Durham. The trail will connect users to an existing trail network, NC Highway 55, the proposed Durham-Orange Light Rail Transit stop on Alston Avenue, Burton Park, Burton Elementary School, East End Park, Long Meadow Park, Eastway Elementary School, Drew/Granby Park, and surrounding neighborhoods. The trail will primarily be a wide, multi-use, ADA accessible sidewalk within the public Right of Way and will transition to bicycle lanes where necessary. The trail is anticipated to cross Holloway Street, Liberty Street, Taylor Street, Morning Glory Avenue, and Angier Avenue. A portion of this trail corridor will be in the FEMA regulated floodplain. Design-to construction budget: $4,462,000 Third Fork Creek Trail Phase II This bicycle and pedestrian trail will be approximately 1.7 miles long. It will extend Phase I of the Third Fork Creek Trail that was built in 2009 and currently ends at Southern Boundaries Park. The new Phase II trail extension identified in the City's Trails and Greenways Master Plan will extend from Southern Boundaries Park north to the American Tobacco Trail connection at Otis Street. The new extension will connect users to an existing trail network, Cornwallis Road, Weaver Street Recreation Center, Weaver Street Park, and surrounding neighborhoods. The trail will be a wide, multi-use, ADA accessible sidewalk within the public Right of Way and boardwalks where necessary. The trail is anticipated to cross E. Cornwallis Road, Jesmond Street, E. Pilot Street, Wayne Circle, and E. Alton Street. A portion of this trail corridor will be in the FEMA regulated floodplain. Design-to construction budget: $8,289,031

Design

Roads / Highways

$12,751,031.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
140
Bidding Soon
1,691
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2026

Project location map

Multiple Locations, Durham, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.