BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fort Edward, New York. Completed plans call for site work for a water / sewer project.

https://www.bizjournals.com/albany/news/2021/03/22/contractors-competing-for-moreau-sewer-project.html a day ago Six Albany region contractors are competing to install five miles of sewer lines along Route 9 and Bluebird Road in Moreau, a job that is expected to encourage investors to redevelop the commercial area around Exit 17 of the Interstate 87 Northway. New Castle Paving of Troy submitted the lowest bid at $11.6 million, followed by Jersen Construction Group of Waterford, which bid just under $12.1 million. Carver Construction of Altamont filed the third-lowest bid at just under $12.5 million. The Cutting Edge Group of Queensbury, Kubricky Construction of Wilton and Bellamy Construction of Schenectady each bid between $13 million and $13.35 million for the job. "We expect to have pipe in the ground by spring," said Moreau town supervisor Todd Kusnierz. "We know we have development coming in that will need sewer." The town has been talking about sewer expansion for years. Voters approved a $16 million expansion in August 2018. Now engineers and the town board will review bids and could select a contractor by the end of the month. The cost of the project was reduced after engineers redesigned the expansion to include low pressure sections, trimming cost estimates by about $1.2 million. At least 12 contractors requested information about the job and six ended up submitting proposals before last week's deadline. One of the primary reasons for the expansion was the town's desire to encourage commercial investments to attract jobs and tax revenue along the busier sections of Route 9. Investors and developers spent $14 million over the past four years purchasing 85 acres along Route 9 in anticipation of the sewer extension. Warehouses, a car wash, offices and health care practices all have been considered in the area. And several projects have been completed. Hudson Headwaters Health Network constructed an $11 million, 24,000-square-foot center and Stewart's Shops built a new store at the corner of Route 9 and Spier Falls Road. Kusnierz expects the majority of the sewer expansion will be finished by the end of 2022. _______________________________________________________________________________ TOWN OF MOREAU SEWER DISTRICT NUMBER 1 EXTENSION 5 includes the installation of approximately 25,600 LF of forcemain sewer, 51,500 LF of low pressure sewer main and services, 200 low pressure grinder pumps, and a central lift station. All qualified bidders, upon return of full Contract Documents, will be refunded the full deposit. All non-bidders, upon return of full Contract Documents, will be refunded one-half of the deposit. All documents, returned for refund, must be received complete, in good condition and within thirty (30) days of the Bid Opening. The engineer's opinion of construction cost for this project is approximately $9,900,000. ALL RFI'S MUST BE RECEIVED A MINIMUM OF 10-DAYS PRIOR TO BID.

Award

Water / Sewer

$11,081,400.00

Public - City

Site Work

100

1

12

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
52
Bidding Soon
900
All Active Projects
410
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2021

May 18, 2021

img_map_placeholder

Multiple Locations, Fort Edward, NY

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.