Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Barstow, California. Completed plans call for the renovation of a educational facility.
As of June 28, 2022, this project is under construction. Each bid must conform and be responsive to all pertinent Bidding and Contract Documents. Copies are on file and open for public inspection at the District Office. For Information Regarding This Project, Prospective Bidders Are Requested to Contact Ledesma & Meyer Construction Company Inc, 9441 Haven Avenue, Rancho Cucamonga, California, 91730-5844, Phone Number (909) 476-0590, Fax Number (909) 476- 0592). Attention is directed to the requirements of the Information for Bidders regarding goals for Disabled Veteran Business Enterprise (DVBE) participation on this project. This project has a goal of 3% DVBE participation. Pre-qualification Requirements: as Required in Pcc 20111.6, Barstow Unified School District Is Requiring That All Prime Contractors Holding an a, General Engineering, or B, General Building License and all electrical, mechanical or plumbing PRIME contractors holding a C-4, C-7, C-10, C-16, C-20, C34, C-36, C-38, C-42, C-43, or C-46 license bidding must be pre-qualified by this District. ALL electrical, mechanical or plumbing subcontractors holding C-4 C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 licenses, listed by PRIME bidders must be prequalified prior to being listed as a subcontractor by a PRIME bidder submitting a bid on the Project. All prequalification packages must be turned in ten (10) business days prior to bid date. Prime Contractors bidding this work shall require, pursuant to Public Contract Code article 4108, all subcontractors providing labor and materials in excess of $100,000.00 to supply an original signature and fully executed 100% Faithful Performance and 100% Payment Bond. All prime contractors bidding on this work must specify this requirement for subcontractor bonds in their written or published request for subcontractor bids. Failure to comply with this requirement shall not preclude contractor from complying with the subcontractor bonding requirements. Bonds are required for each specification section or combination of sections which exceed(s) the limit listed above. The practice of issuing separate purchase orders and / or subcontracts for the purpose of circumventing the subcontractor bonding requirement shall not serve to exempt the Contractor from these requirements. No payments, except for a reimbursement payment to the Prime Contractor for the cost of the Prime Contractors own Faithful Performance and Payment Bonds, shall be made to the Prime Contractor until the Prime Contractor provides the aforementioned subcontractor bonds to the District through the Construction Manager. No bidder may withdraw his bid for a period of NINETY (90) days after the date set for the opening thereof. The District reserves the right to reject any and all bids and to waive irregularities in any bid. For further information consult the Information for Bidders and the Contract Documents.
Under Construction
Educational
$6,000,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2019
January 4, 2022
1000 Armory Rd, Barstow, CA
Related To This Project
Barstow, CA
Bid Date: May 27 2022
Barstow, CA
--
Barstow, CA
Bid Date: Jul 22 2022
Barstow, CA
Bid Date: Mar 31 2021
Barstow, CA
Bid Date: Sep 28 2022
Barstow, CA
Bid Date: May 18 2021
Barstow, CA
Bid Date: Jan 20 2023
Barstow, CA
Bid Date: Jan 30 2023
Barstow, CA
--
Barstow, CA
Bid Date: Apr 06 2022
Barstow, CA
--
Barstow, CA
Bid Date: May 02 2022
Barstow, CA
--
Barstow, CA
Bid Date: Apr 26 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.