BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 7, 2024 at 7:00 PM

Updated March 8, 2024

Site work for a civil project in Penhold, Alberta. Completed plans call for site work for a bridge / tunnel; and bridge / tunnel.

Bridge Culvert Replacement and Other Work 42:08 B.F. 01710 - Carrying Hwy. 42 over a Tributary to Threehills Creek, E of Penhold, AB CENTRAL REGION APPROXIMATE QUANTITIES: 1 Lump Sum Traffic Accommodation for Bridge Construction 1 Lump Sum Backfill 41.30 Metre Smooth Wall Steel Pipe - Supply and Install (1200 mm dia.) 80 Cubic Metre Grouting of Abandoned Culverts 50 Cubic Metre Heavy Rock Riprap (Class 1) 1 Lump Sum Clearing, Topsoil, and Seeding Contractor to supply all materials. Question Deadline 03/01/2024 Award is subject to final approval.

Award

Bridges / Tunnels

$289,055.00

Public - State/Provincial

Site Work

5

7

3

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
21
Bidding Soon
550
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

May 1, 2024

Project location map

Multiple Locations, Penhold, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.