BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Charlotte, North Carolina. Completed plans call for site work for a water / sewer project.

Phase 1 Freedom Section start: Summer 2020. Completion Fall 2021 Phase 2 Sedgefield Section start: Fall 2021. Completion Fall 2022 Phase 3 Park & Mcdonald Ave, start: Summer 2022. Complete Summer 2023 Dairy Branch is located in south Charlotte. It is a tributary creek of Little Sugar Creek that currently has approximately 8,500 LF of 18 to 10 inch gravity sewer tributary to the 48 inch Little Sugar Creek Interceptor that follows the creek from Freedom Park through Sedgefield Middle School and park to South Boulevard. The upper end of this sewer was rehabilitated in 1998 and the lower end of the sewer in Freedom Park was replaced in 1993. This line has been identified as having capacity issues related to growth in the basin. This project requires additional SSES work to further identify the issues and project future flows and then survey, design, permitting and easement acquisition to build the long term improvements needed for this basin. The initial project budget is $6M and the project completion goal is by the end of 2020. MBE Goal 10%: May be satisfied by an entity that qualifies as a Minority Business Enterprise under N.C. Gen. Stat. 143-128, and that has been certified as a Historically Underutilized Business by the State of North Carolina, and furthermore has an ethnic designation of either African American, Hispanic, or Native American with a significant business presence in the Charlotte Combined Statistical Area. WSBE Goal 10%: May be satisfied by an entity that is certified by the City of Charlotte under Part E of the CBI Policy as meeting all of the requirements for SBE certification and/or WBE registration. Aggregate MWSBE Goal (Project Goal) 20%: The total work performed by MBEs, WBEs, or SBEs in the aggregate for this Project.

Under Construction

Water / Sewer

$12,000,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
46
Bidding Soon
1,150
All Active Projects
482
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2018

September 1, 2020

img_map_placeholder

Multiple Locations, Charlotte, NC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.