BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Charlotte, North Carolina. Completed plans call for site work for a water / sewer project.

As of June 1, 2021, this project is under construction. Construction started November 2020. This is Phase III of the Davidson Water Main project and would extend the 24-inch water main from the Phase I point of connection at S. Main and Walnut streets to Potts Street and then north along the alignment of Potts, Sloan and Beaty streets to N. Main Street just south of the Mecklenburg/Iredell County Line. This alignment generally follows the alignment of the NCDOT roadway improvements planned along this corridor. Work would include points of connection to the existing water distribution system at Main/Walnut, Griffith/Beaty, and Beaty/Main streets. Likewise, there will be two cased crossings of the Norfolk Southern Railroad and a cased crossing at Griffith Street. Also, a new 16 or 12 inch water line from NC Highway 115 and Walnut Street in Davidson up to the Davidson Pointe subdivision in Iredell County at Bridges Farm Road off NC Highway. This project consists of approximately 15,000 LF of water main in Town of Davidson and will involve NCDOT roads. Note that the project crosses through a known asbestos contaminated site. Phases 1 and 2 of this project are currently under construction and should be completed in summer 2019. This phase will need to evaluate and rehab or replace all water and sewer infrastructure necessary along the alignment as directed by CLTWater. CLTWater has also identified some sewer capacity limitations in the South Street area of Davidson from Concord Road down to the Davidson Elementary School site. There are three existing sewer pump stations that pump to these sewers that may be causing the sewer capacity limitations. Project is included City of Charlotte FY 2021-2025 CIP. MBE Goal 10%: May be satisfied by an entity that qualifies as a Minority Business Enterprise under N.C. Gen. Stat. 143-128, and that has been certified as a Historically Underutilized Business by the State of North Carolina, and furthermore has an ethnic designation of either African American, Hispanic, or Native American with a significant business presence in the Charlotte Combined Statistical Area. WSBE Goal 10%: May be satisfied by an entity that is certified by the City of Charlotte under Part E of the CBI Policy as meeting all of the requirements for SBE certification and/or WBE registration. Aggregate MWSBE Goal (Project Goal) 20%: The total work performed by MBEs, WBEs, or SBEs in the aggregate for this Project.

Under Construction

Water / Sewer

$6,000,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
73
Bidding Soon
1,155
All Active Projects
471
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.