Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a mixed-use development in Charlottesville, Virginia. Completed plans call for the construction of a 186,614-square-foot, 251-bed educational facility; for site work for a educational facility; educational facility; and 55,476-square-foot, 95-space parking garage.
The University proposes to construct two new residence halls on Brandon Avenue sites B and C, located on the west side of Brandon Avenue in the City of Charlottesville. The Project will include approximately 350 student beds in apartment-style arrangements, plus associated social spaces, resident staff accommodations, and support spaces. A 300-seat dining facility will be located on the ground floor of the Site C building. Two levels of podium parking will be included beneath the Site C building. The student apartments will be based upon a 16-bed apartment, connected over two floors via an internal, interconnecting stair. In order to foster multiple levels of community, the 16-bed apartment will be comprised of two groups of 8 single bedrooms, paired across a common living and dining area, stacked one above the other. Each 8-bed group will be comprised of two 4-bed sub-groups, each with a kitchen plus one full bath and one half bath. The exception to these is the apartments for the resident advisors and senior resident, that will be one-bedroom apartments. Site B will be six stories in height, with Level 1 consisting of community space including a lobby, common lounge space, and a laundry space. Levels 2-6 consist of residential housing, with approximately four 16-bedroom apartments, two 14-bedroom apartments, two 8-bedroom apartments, one 7-bedroom apartment, and five studio apartments. A total of 120 beds are planned in 67,036 GSF of building area. In order to begin construction on Site B, a sanitary line that feeds the Baptist Student Union will need to be relocated. The new sanitary path will run under the new South Lawn Connector park which is just north of Site B and provides barrier free access from the South Lawn down to Brandon Ave. The construction documents for this work are included and will be constructed as designed by the selected D/B team. Site C will consist of two levels of enclosed parking (Levels P1 & P2), one level of community space including a lobby, dining, common lounge space, laundry, and four levels of residential housing. Approximately thirteen 16-bedroom apartments, one 15-bedroom apartment, one 1-bedroom apartment, and seven studio apartments. A total of 231 beds are planned in 119,578 GSF of building area. Approximately 95 parking spaces are planned in 55,476 GSF of garage area. The building will employ a palette of brick veneer over metal framing and exterior sheathing with punched aluminum windows, and curtain walls. The roof will be EPDM roofing membrane with primary and secondary drains. The Project site will be available in September 2020. The D/B will communicate their preferred schedule to meet the Substantial Completion date of June 2023. Proposed Site: The buildings are to be located on Site B and Site C of the new Brandon Avenue Master Plan. These sites are located to the west side of the new Brandon Avenue loop, south of JPA Avenue, west of the new Student Health building, north of Bice House, and east of South Lawn Gibson Hall. LEED/ SUSTAINABILITY GOALS AND IMPLEMENTATION The D/B shall implement practices and procedures to meet the University's sustainability performance goals, that include achieving LEED Certification. Specific Project goals that may impact the D/B include: Coordination of Subcontractors (waste haulers) related to Construction and Demolition Waste Management. Coordination of Subcontractors related to compliance with a Construction Indoor Air Quality Management Plan. Special Substitution Requests for LEED Initiatives. Compliance with Specified Material and Documentation Requirements Related to the Use of RecycledContent Materials; Use of Locally/ Regionally-Manufactured Materials; Use of Low-Emitting Materials; and Use of Certified Wood Products.
Award
Educational
$70,000,000.00
Public - State/Provincial
LEED Certification, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2020
May 3, 2021
Brandon Ave, Charlottesville, VA
Related To This Project
Charlottesville, VA
Bid Date: Jan 27 2022
Charlottesville, VA
--
Charlottesville, VA
--
Charlottesville, VA
--
Charlottesville, VA
Bid Date: Mar 16 2021
Charlottesville, VA
Bid Date: Mar 04 2022
Charlottesville, VA
--
Charlottesville, VA
Bid Date: Jan 13 2022
Charlottesville, VA
Bid Date: Feb 17 2022
Charlottesville, VA
Bid Date: Feb 22 2022
Charlottesville, VA
Bid Date: Feb 25 2019
Charlottesville, VA
Bid Date: Mar 21 2019
Charlottesville, VA
Bid Date: Jan 26 2022
Charlottesville, VA
Bid Date: Jan 18 2022
Charlottesville, VA
Bid Date: Jan 11 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.