BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 4, 2022 at 8:00 PM

Updated September 14, 2023

Site work and new construction of a civil project in Morgan Hill, California. Design plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

This project involves a multi-year operational reorganization of the existing Holiday 1/2/3 and Holiday Lake pressure zones. The three existing East Dunne pump stations separately pump to the Holiday Lake Zone, Holiday 1 Zone, and Holiday 2 Zone. The existing East Dunne pump stations are planned for replacement with one new pump station, pumping to a new water storage tank along East Dunne Avenue. This project consists of the construction of a new water storage tank, replacement pump station, new and replacement water pipelines, and a pressure reducing station. The project is included in the City of Morgan Hill's FY 2022-2025 Capital Improvement Program (CIP). Per the owner, as of May 4, 2022, a design team has been selected. The owner states that the project is anticipated to go out for bids in FY 23/24. A firm timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Water / Sewer

$5,300,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
339
Active Projects
176
Bidding Soon
2,510
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2022

Project location map

E Dunne Ave, Morgan Hill, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.