BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Escondido, California. Completed plans call for the renovation of a educational facility.

**The start date will be in April 2019 to be completed by August 2019. Project Locations: Rincon Middle School 925 Lehner Avenue, Escondido, CA 92026 Pioneer School, 980 N. Ash Street, Escondido, CA 92027 Replacement and installation of new HVAC units and new mechanical curbs on 2 permanent buildings, 2 new HVAC curbs on building M and 1 new HVAC curb on building A.Bids must be submitted to the District on the Bid Forms that are a part of the Bid Package for the Project. Prospective bidders may obtain one (1) complete set of Contract Documents. Contract Documents may be obtained from the District at the location(s) and at the time(s) indicated in the Notice Inviting Bids. Prospective bidders are encouraged to telephone in advance to determine the availability of Contract Documents. Any applicable charges for the Contract Documents are outlined in the Notice Inviting Bids. The District may also make the Contract Documents available for review at one or more planrooms. Please Note: Prospective bidders who choose to review the Contract Documents at a plan room must contact the District to obtain the required Contract Documents if they decide to submit a bid for the Project. The Work shall be commenced on the date stated in the District's Notice to Proceed. The Contractor shall complete all Work required by the Contract Documents within Sixteen (16) calendar days from the commencement date on the Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set forth above is adequate and reasonable to complete the Work. Project Description: Removal and replacement of 3 Rooftop package HVAC units with curbs. Work includes the Installation of new electrical disconnects, new condensate piping and traps and new gas piping as required. All existing control wires will be reconnected. New sheet metal caps will be installed on all rooftop platforms. Some interior ceiling removal and replacement and roof patching is anticipated. Completion Time- August 6, 2019 ; Liquidated Damages- ($500.00) per day for each calendar date completion is delayed Removal and replacement of 3 Rooftop package HVAC units with curbs. Work includes the Installation of new electrical disconnects, new condensate piping and traps and new gas piping as required. All existing control wires will be reconnected. New sheet metal caps will be installed on all rooftop platforms. Some interior ceiling removal and replacement and roof patching is anticipated.

Award

Educational

$665,000.00

Public - City

Renovation

1

25

7

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
126
Bidding Soon
1,999
All Active Projects
936
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2019

April 1, 2019

img_map_placeholder

Multiple Locations, Escondido, CA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.