BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2023 at 7:00 PM

Updated January 27, 2024

Renovation of a water / sewer project in Billings, Montana. Completed plans call for the renovation of a water / sewer project.

The project consists of a West End Water Treatment Plant (WEWTP) capable of treating Yellowstone River water either directly from a Billings Bench Water Association (BBWA) diversion facility or from future reservoirs to meet all primary drinking water standards. The WEWTP will deliver up to 18 MGD and be expandable to 36 MGD. Process design includes rapid mix chemical pre-treatment, flocculation, sedimentation and membrane filtration. Filtered water will be delivered to the City's distribution system by pumping from a below-grade clearwell through high service pumps. WEWTP building design, yard piping connections and residual solids handling facilities are also included in the project. During the preconstruction phase, the Contractor will work as an integral part of the project team to evaluate and further develop the project design, assisting the Engineer and City in identifying opportunities for improvement, value engineering, and offering alternative solutions. The various project design components currently range between 60% to 90% complete. The Contractor will develop cost estimates and offer suggestions with respect to means, methods, materials innovations and construction sequencing. During the construction phase, the Contractor will provide the necessary resources and subcontractors to construct the project. Throughout the entire process, the objective is to maintain a spirit of cooperation and open communication so that project goals and objectives are clearly understood, potential problems are promptly resolved, and upon completion, the project is deemed a success by all. Questions regarding this Request for Qualifications and Proposals (RFQ&P) shall be submitted to: City of Billings Attention: Randy Straus, PE City Engineer's Office 2224 Montana Ave Billings, MT 59101 (406) 657-8301 strausr@billingsmt.gov from 7:30 a.m. to 4:30 p.m., local time, Monday through Friday

Post-Bid

Water / Sewer

$65,000,000.00

Public - City

Renovation

262

31

2

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
1
Bidding Soon
98
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2023

December 12, 2023

Project location map

To Be Determined, Billings, MT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.