BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 10, 2025 at 8:00 PM

Updated March 11, 2025

Site work for a playground / park / athletic field in Clearwater, Florida. Conceptual plans call for site work for a playground / park / athletic field.

UPDATE :https://www.myclearwater.com/files/sharedassets/public/v/1/finance/documents/clearwaterfl_fy2024_25annualoperatingcapitalbudget.pdf The EC Moore Fields 1-4 Complex is set for a comprehensive upgrade to cater to sports tourism and local softball enthusiasts. Known for hosting national softball tournaments, Clearwater’s 40-year-old fields are due for modernization. The TDC-backed project includes a three-story press box, restrooms, a meeting building, expanded seating, new dugouts, tech upgrades, improved drainage, irrigation, and parking. The design incorporates Greenprint 2.0 elements like LED lighting and solar panels. Project is in City of Clearwater capital budget fy 2024-2025 CIP 334 ______________________________________________________________________________________________________________________________________ https://www.bizjournals.com/tampabay/news/2025/02/20/rays-stadium-county-commissioner-chris-latvala.html Other capital projects that requested at least $9 million in tourist tax funds this year are listed below. Tourist board members on Wednesday recommended that each of the projects other than the orchestra project at the Mahaffey Theater receive some level of funding. Morean Arts Center and Chihuly Collection expansion ($15.2 million) Repairs at the Eddie C. Moore Complex in Clearwater ($10 million) Repairs at the Clearwater Beach Municipal Marina ($10 million) Repairs at the Clearwater Marine Aquarium ($9.8 million) New orchestra center at the Mahaffey Theater in St. Pete ($9.5 million)" ____________________________________________________________________________________________________________________________________________________ https://www.bizjournals.com/tampabay/news/2024/07/17/woodson-african-american-musuem-pinellas.html Morean Arts Center and Chihuly Collection: $15.1 million for the construction of a 5-story building to house an expanded collection Clearwater Beach Municipal Marina: $10 million for repairs UPDATE :https://www.myclearwater.com/files/sharedassets/public/v/1/finance/documents/clearwaterfl_fy2024_25annualoperatingcapitalbudget.pdf Eddie C. Moore Softball Complex in Clearwater: $10 million for upgrades Clearwater Museum Aquarium: $9.8 million to remodel the facility designated for incoming sea lions Florida Orchestra: $9.5 million for the construction of a new Center for Music Education & Innovation Palladium Theatre: $2.5 million for the renovation of the 800-seat hall _____________________________________________________________________________________ UPDATE: https://www.myclearwater.com/files/sharedassets/public/v/1/finance/documents/clearwaterfl_fy-2023-24_annual_operatingcip_budget.pdf This project provides for the renovation of the two major soccer fields at EC Moore Complex which have been used by club soccer for over 36 years. Unfortunately when these fields were constructed they were constructed on two levels which does not allow for the most optimal use of the land for soccer play, at times causing the lower field to flood and not be used under current conditions. This project will completely renovate these fields by leveling them off, installing new irrigation, sod, fencing and lighting. Comprehensive Plan Objective: (I.1.1.5.2) The repair, remodeling, renovation or replacement of obsolete or worn out facilities that contribute to achieving or maintaining standards for levels of service. Project is in City of Clearwater capital budget fy 2023-2028 CIP 335 _______________________________________________________________________________________________________________________________________ This project provides for the renovation of the two major soccer fields at EC Moore which have been used by club soccer for over 35 years. Unfortunately when these fields were constructed they were constructed on two levels which does not allow for the most optimal use of the land for soccer play. This project will completely renovate these fields by leveling them off, installing new irrigation, sod, and fencing. As of November 22, 2022, project is included City of Clearwater FY 2022-2028 CIP. Bidding for design team and general contractor selection timeline has not been determined. A firm construction timeline has not been disclosed. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Playgrounds / Parks / Athletic Fields

$20,000,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
114
Bidding Soon
1,903
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.